News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. Tridel

    Toronto Solaris at Metrogate Condos | ?m | 40s | Tridel | Graziani + Corazza COMPLETE

    Tridel Metrogate Construction Video 2011 Here's little look back in history. We produced a video to show some of the great team behind the construction, sales and customer service of our Metrogate community at Kennedy and 401. Things have moved quickly since the video was shot. The Metrogate...
  2. Tridel

    Toronto Toronto | One Old Mill & Two Old Mill | ?m | 12s | Tridel | Kirkor Architects

    Tridel One Old Mill Construction Panorama May 12, 2012 Some panos I took of One Old Mill on Saturday. Views are looking east from the Presentation Centre at 2500 Bloor St. W. Bloor St. W. is to the right. The Presentation Centre is set to relocate at the end of the month. The...
  3. Tridel

    Toronto Toronto | Parc Nuvo at Essex | ?m | 36s | Graziani + Corazza

    Tridel Parc Nuvo Amenities and views from 31st floor I was out at Parc Nuvo yesterday shooting 360's of the two new model suites and went up to the 31st floor to shoot some panorama's from the two balconies of suite 3107. Too bad the storm rolled in but the views are incredilble. From Sunnyside...
  4. Tridel

    Toronto Toronto | 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    300 Front St W construction photos Some early May construction photos of 300 Front St. W. from our Facebook photoset. Loft east side (John St.) Lofts south side facing future public square Tower east side facing future public square Tower south side (Front St. W.) Tower west side
  5. Tridel

    Toronto Toronto | Ventus at Metrogate Condos | ?m | 30s | Tridel | Graziani + Corazza

    May 4, 2012: Ventus 2 construction update: Construction at Ventus is moving along well, we are now pouring concrete for the 28th floor, and the exterior precast has been installed to the 17th floor. Windows are being installed currently on the 15th floor and the interior finishing work such...
  6. Tridel

    Toronto Toronto | 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    Construction photo from today at 11:30. Glass is being installed on the fourth floor of the east tower face today. The 12th floor of the tower was poured this week. The red hoarding for the RCS is being installed. Updated photos every 30 minutes on the live construction camera. Here's a...
  7. Tridel

    Toronto Toronto | 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    RCS signage was delivered to the site.
  8. Tridel

    Avonshire (Yonge/401, Tridel/K&G, 14 + 21 + 3x 22s, Kirkor) COMPLETE

    Aristo at Avonshire construction camera is being set up on top of Avonshire to take pictures every 30 minutes. Excavation and shoring is well underway.
  9. Tridel

    Toronto Toronto | One Old Mill & Two Old Mill | ?m | 12s | Tridel | Kirkor Architects

    March 31, 2012 Construction A couple of panoramas I assembled after taking some pictures on Saturday. Excavation and shoring is progressing well with a welcome dry spell. View east from Old Mill Drive from the soon to be demolished presentation centre. View looking south towards Bloor...
  10. Tridel

    Toronto Toronto | 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    Here's a shot from our construction camera at 9:00 am this morning showing the newly installed glass. The tower is rising quickly and I'm looking forward to going down there and shooting some pictures from the top slab. Apparently you can see the lake and islands now.
  11. Tridel

    Toronto Toronto | 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    300 Front Street West automatic climbing system blog was posted by Lindsay, along with 24 photos.
  12. Tridel

    Toronto Toronto | West Village Etobicoke | ?m | 31s | Tridel | Rafael + Bigauskas

    First day of spring and a great day to be constructing a 27 storey tower, West Village 1.
  13. Tridel

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor

    Hullmark Centre construction camera is back online The Hullmark Centre construction camera is back online. Thanks to UCIT Online.
  14. Tridel

    Toronto Toronto | One Old Mill & Two Old Mill | ?m | 12s | Tridel | Kirkor Architects

    One Old Mill construction photo from March 4, 2012.
  15. Tridel

    Toronto Toronto | West Village Etobicoke | ?m | 31s | Tridel | Rafael + Bigauskas

    Construction photography Feb. 22, 2012 Some construction photos taken February 22, 2012. More images on the West Village image gallery and Facebook.
  16. Tridel

    Toronto Toronto | Parc Nuvo at Essex | ?m | 36s | Graziani + Corazza

    Tridel Parc Nuvo Construction photos taken Feb 19, 2012 by L. Chapman. Construction crane lowered to the street: (L-> R) Nuvo 1, Nuvo 2 and Parc Nuvo More images can be found on our Facebook page.
  17. Tridel

    Toronto Toronto | Avani and Avani2 at Metrogate Condos | 105.15m | 35s | Tridel | Graziani + Corazza

    Metrogate Park- engineered to be multifunctional The park was engineered to collect storm water and is part of the LEED Neighbourhood Development Pilot, saving on infrastructure costs from storm runoff. After a heavy storm, the bridge gets visitors from Solaris and Ventus over the soggy section...
  18. Tridel

    Toronto Toronto | 300 Front Street West | 156.05m | 49s | Tridel | Wallman Architects

    Jim Ritchie on BNN Yesterday Video of Jim Ritchie being interviewed at 300 Front on BNN. http://bit.ly/xfRqgf http://bit.ly/xfRqgf
  19. Tridel

    Toronto Toronto | West Village Etobicoke | ?m | 31s | Tridel | Rafael + Bigauskas

    The crane has been installed on site. Image taken from the construction camera.
  20. Tridel

    Toronto Toronto | Parc Nuvo at Essex | ?m | 36s | Graziani + Corazza

    Crane Installed Almost all the glass has now been installed Image taken from the construction camera.

Back
Top