News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. A

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    The same Report confirms the timelines: Lower Yonge Precinct Project - 2024 to 2025 • Shortening the Lower Jarvis Street off-ramp to Yonge Street; and • Removal of the Bay Street on-ramp to eastbound Gardiner Expressway. Gardiner East EA Project - 2026 to 2030 • Construction of two new access...
  2. A

    GO Transit: Construction Projects (Metrolinx, various)

    I just posted last week but I figured this was worthy of an update. Last slab pour for the Rutherford grade separation is happening today: https://giant.gfycat.com/TatteredRadiantHarlequinbug.mp4
  3. A

    Vaughan Toronto | Transit City Condos: TC4 & TC5 | 174.34m | 50s | SmartCentres | Diamond Schmitt

    Starting to make their mark on the VMC skyline:
  4. A

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Does anyone know if the Staging Report linked below is the most recent document for how they plan on doing this work? This would be the Hybrid 3 plans that begin on Page 25. I imagine this stage of work hasn't been tendered out yet so plans aren't finalized but just looking at the concepts, it's...
  5. A

    Vaughan Toronto | Transit City Condos: TC4 & TC5 | 174.34m | 50s | SmartCentres | Diamond Schmitt

    You're right - because of the design 2 units per floor on (1 on north and 1 on south) doesn't have a balcony. I assume the units with a missing balcony will have juliet doors that can be opened to look directly down on the balcony of the unit below effectively ruining any privacy a balcony...
  6. A

    Toronto Toronto | Macdonald Block Reconstruction | ?m | ?s | Infrastructure ON | WZMH

    Shame we haven't seen some photo updates from the Government like Metrolinx does for their projects. Lot's of interesting areas within these buildings.
  7. A

    GO Transit: Construction Projects (Metrolinx, various)

    Rutherford Grade Separation - that's a lot of concrete!
  8. A

    Vaughan Toronto | Bravo, Encore at Bravo | 148.85m | 45s | Menkes | Turner Fleischer

    First docs are in for the lands immediately to the south of Festival Condos. 45, 36, and 31s.
  9. A

    Vaughan Toronto | Eagles Nest Golf Course Redevelopment (Phase 1) | 96.75m | 28s | The Muzzo Group | BDP Quadrangle

    Wow so PlanIt now includes the concept plans for the redevelopment of the entire existing area (Lowes and Walmart). I imagine this full buildout is 15-20 years from now as they are still building new small retail along McNaughton. But awesome to see that the landowners are committing to a full...
  10. A

    Vaughan Toronto | Eagles Nest Golf Course Redevelopment (Phase 1) | 96.75m | 28s | The Muzzo Group | BDP Quadrangle

    There's an interesting development that popped up on City of Vaughan Developer Applications nearby at Eagle's Nest. Great view if you're a golf fan!
  11. A

    Richmond Hill Toronto | Yonge Line 1 North Subway Extension | ?m | ?s | Metrolinx

    Maybe this has already been posted before but I found this particular quote interesting from https://edrh.rhpl.richmondhill.on.ca//default.asp?ID=s6.8 : "But the optimism generated by the new train service turned to gloom at Richmond Hill. The surveyors and engineers had run the line six...
  12. A

    Danforth Line 2 Scarborough Subway Extension

    2532 Eglinton Avenue East
  13. A

    Danforth Line 2 Scarborough Subway Extension

    Yes, this means that of the three teams that submitted a detailed proposal for the Project, Strabag was the team with the best overall Technical and Financial scores. IO will now negotiate and finalize some initial terms with Strabag to make sure everything is sound which will lead to them being...
  14. A

    Danforth Line 2 Scarborough Subway Extension

    Yes - https://www.infrastructureontario.ca/Teams-Shortlisted-Eglinton-Crosstown-Scarborough-Advance-Tunnel/ Yup last one was early December so we should see it soon.
  15. A

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    News release for First Negotiations Proponent is out. Looks like IO really wants people to know these projects are moving forward as typically they wait until Preferred Proponent...
  16. A

    Danforth Line 2 Scarborough Subway Extension

    News release for First Negotiations Proponent is out. Looks like IO really wants people to know these projects are moving forward as typically they wait until Preferred Proponent...

Back
Top