We were watching the excavation for a bit, and I was curious how far away the trucks are going to dump their load, and how exactly do the tandem dump trucks dump their load?
if the drive is 20 minutes each way, 5 minutes stopped on either end, that's 10 trucks going to keep the excavator working??