News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.1K     0 

  1. drum118

    Mississauga Toronto | M3 at M City | 260.29m | 77s | Rogers Real Estate | Arcadis

    Nov 29 They are enclosing the damper area Nov 22 Shot from Islington Ave overpass
  2. drum118

    VIA Rail

    Nov 22 More up on my site They have built another building next to the new Siemens SCV-42 locomotive Trainsets building. They still don't have all the tracks in place for both new buildings. There were 5 Siemens SCV-42 locomotive trainsets in the yard.
  3. drum118

    Toronto Toronto | Pinnacle One Yonge | 351.85m | 106s | Pinnacle | Hariri Pontarini

    Nov 22 Shot from Islington Overpass Shot from Brown's Line
  4. drum118

    Mississauga Dixie Rd/QEW New Interchange (MTO, 1s, AECOM)

    Nov 27 No shifting of the eastbound lanes yet as they were paving at the far east end today. Saw no striping for the ramps.
  5. drum118

    TTC: Other Items (catch all)

    November 27, 2025 OVIN and the TTC to Pilot New Made-in-Ontario Transit Technologies The Ontario Vehicle Innovation Network (OVIN) is partnering with the Toronto Transit Commission (TTC) to pilot innovative transit solutions that could improve safety, reliability, and customer experience. As...
  6. drum118

    miWay Transit

    It will be interesting to see where they want the land for the BRT but behind close doors at this time.. The Four Corners area is not to be part of this request as it will be up to developers when they redevelop the site even if it means 2046+ and a pinch point of one lane of traffic each way...
  7. drum118

    GO Transit: Construction Projects (Metrolinx, various)

    Nov 22 More up on my site No idea which bridge will be remove first over the Etobicoke Creek Dec 6-7. It could be the Track 3 girder bridge or the double track deck truss bridge It was stated that it is possible that when the deck truss bridge is remove that 4 girder bridges could be install...
  8. drum118

    GO Transit: Construction Projects (Metrolinx, various)

    Nov 22 Long Branch GO Station with a lot more up on my site By the looks, the new east tunnel is ready to be move during the line closure on Dec 6-7
  9. drum118

    Finch West Line 6 LRT

    There been talk that the Finch Line will end up at Pearson some day as well being extended to Yonge but Woodbine is the next extension in the coming years. One hope the ML has a clue how an LRT should be built in the first place by then as well IO knowing how an LRT should be built and be tender...
  10. drum118

    Finch West Line 6 LRT

    We will be a live hopeful for line 6 opening which is around the corner, most likely line 5, but we may not be around for QQE and Eglinton East Line openings at the rate they are going at these days. One never know when their time is up and don't know when it happens.
  11. drum118

    Toronto Toronto | Gilgan Family Queensway Health Centre | 45.1m | 9s | Trillium Health Partners | Stantec

    Nov 22 Lot more up on my site North tower is top off at at the 6th floor with the south tower being form for the 8th lloor. The 4th floor will be for surgery as it has a higher ceiling height
  12. drum118

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Everyone is wasting their breath asking ML anything about any of their projects and a timeline let alone a date. We have seen this time after time on Line 5 and Line 6 as well other ones. Nov 26 Rebar frames are being place in the guidewys on both side of the still close 407 bridge for the OS...
  13. drum118

    Toronto Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    November 2025 Construction Notice #64: Port Lands Flood Protection & Lake Shore Boulevard East Projects Construction Manager Read The Full Notice A pdf will be available to download from our document library shortly. Please check back for updates...
  14. drum118

    Finch West Line 6 LRT

    Unless Alstom is planning on retraining the Brampton site for future orders, the jigs will have to be ship to Thunder Bay or Quebce as they are planning on closing the Millhaven plant with CN removing the spure to it. Cos to ship the two sections will be more costly to ship from TB or Quebec...
  15. drum118

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Mississauga Uptown since the city is calling the area.Uptown
  16. drum118

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Construction got underway summer of 2019 six years ago. It been stated by trades that the same problem ION LRT had during the building of it is still taking place on Hurontario today.
  17. drum118

    Metrolinx: Other Items (catch all)

    Be stuip and pay the price for it Second man dies following light-rail train collision on Montreal’s South Shore

Back
Top