News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. Tim MacDonald

    Some GTA Aerials by Tim MacDonald (Covid19 induced Boredom)

    I was up and out the door early this morning and logged 55 minutes of flight time and 14.4 km travelled over 4 flights. I didn't shoot Exchange directly but it is certainly starting to dominate the MCC skyline!
  2. Tim MacDonald

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    So I was up and out early this morning and shot a good chunk from 403 down to Cooksville GO. I'll post those in due time but this thing caught my eye while driving down towards the Go station. @drum118 is this one of the hydro substations for the LRT? It is located on the east side, just south...
  3. Tim MacDonald

    Mississauga Toronto | Keystone Condos | ?m | 23s | Kaneff | Turner Fleischer

    Wow, almost a year since I last shot this project. This is the only shot I managed to get of it this morning since I was at maximum range from my location at Cooksville GO. Call it done for Keystone.
  4. Tim MacDonald

    Mississauga Toronto | Brightwater Towns | ?m | 3s | PCWVP | superkül

    It appears they already have with framing up on the slab that sits over the Mason parking garage. Photos from November 21
  5. Tim MacDonald

    Some GTA Aerials by Tim MacDonald (Covid19 induced Boredom)

    More photos from yesterday. Weather this weekend isn't looking promising for flight. Brightwater J.C. Saddington Park Directly east of Brightwater is an old established neighbourhood. Those trees are hanging onto their leaves!
  6. Tim MacDonald

    Mississauga Toronto | Brightwater | ?m | 35s | Kilmer | Giannone Petricone

    Ok, I didn't have enough coffee this morning when I posted above. Looking at the plans reminded me that the little landscaped area is temporary.
  7. Tim MacDonald

    Mississauga Toronto | Brightwater | ?m | 35s | Kilmer | Giannone Petricone

    November 21-what was previously construction parking since the start of the project has now been partly landscaped. The former sales office which had been located on the SW corner of Lakeshore and Mississauga road appears to be a permanent community type structure now as it has been integrated...
  8. Tim MacDonald

    Toronto Toronto | Six Points Plaza Redevelopment | 144.6m | 45s | Liberty Development | Arcadis

    Has no one noticed that a good chunk of the existing plaza will remain through phase one? I missed that until now. Looking at the plan @Northern Light posted it appears that only the area immediately north of Shoppers and south of the Canadiana will be nuked for the roadway and most of this...
  9. Tim MacDonald

    Mississauga Toronto | Port Credit Harbour West Parks | ?m | ?s | City of Mississauga | Dillon Consulting

    November 21st. I'm looking forward to this opening.
  10. Tim MacDonald

    Some GTA Aerials by Tim MacDonald (Covid19 induced Boredom)

    Port Credit this afternoon on a rather unsettled day. The Port Credit Harbour West Park, visible in the first photo, is all but done.
  11. Tim MacDonald

    Toronto Toronto | Six Points Plaza Redevelopment | 144.6m | 45s | Liberty Development | Arcadis

    That thing appeared fully leased when I was by there recently.
  12. Tim MacDonald

    Mississauga Toronto | U of T: UTM Student Residence | ?m | 7s | U of T | Montgomery Sisam

    @Paclo One crane went up today. I'll get shots on the weekend, weather permitting.
  13. Tim MacDonald

    Toronto Toronto | 3429 Bloor Street West | 51.67m | 14s | Verve | Giannone Petricone

    View of the site on November 2nd, 2024
  14. Tim MacDonald

    Mississauga Toronto | The Kith and Kindred Condominiums | ?m | 25s | Daniels | Kirkor

    November 18th. Landscaping in full swing
  15. Tim MacDonald

    Some GTA Aerials by Tim MacDonald (Covid19 induced Boredom)

    Looking east on Eglinton Ave at Erin Mills Parkway. Kith and Kindred on the left is rapidly progressing towards completion after a three year build in this late morning November 18th photo.
  16. Tim MacDonald

    Pickering Airport (Transport Canada/GTAA, Proposed)

    Weather, @yyz or downline stations is really the only mass delay cause. A few years ago runway rehab caused delays but your argument that YYZ can't handle current traffic is wrong.
  17. Tim MacDonald

    Pickering Airport (Transport Canada/GTAA, Proposed)

    YYZ does not have 3hr delays due to ATC regularly. I've seen 2hr deicing related delays but not just run of the mill ATC problems.

Back
Top