With less than a week to go before the revised Phase 1 opening deadline of "spring" expires, the Town of Whitby is holding an event on Saturday morning in which the public can ride, walk, rollerskate, etc Phase 1 of the extension. Specifically, a 1.5 km stretch between Baldwin South and...