News   GLOBAL  |  Apr 02, 2020
 9.7K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.5K     0 

  1. smably

    Toronto Marlow | 113.41m | 33s | Fitzrovia | Turner Fleischer

    Ya know... I don't hate it?
  2. smably

    Toronto Toronto | QRC West Phase 2 (Queen Richmond Centre West) | 35.96m | 7s | Allied | Sweeny &Co

    In case you're still seeking photos, I snapped a wide shot the other day when I was at MEC:
  3. smably

    Toronto Toronto | 316 Junction Condos | 88.35m | 26s | Marlin Spring | Jahan Mehr

    Why is there a render-cybertruck? 😑
  4. smably

    Toronto R.C. Harris Water Treatment Plant | City of Toronto

    Here's one from my archives. 2015:
  5. smably

    Toronto Toronto | GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Speaking of the Greenway, neighbours are getting antsy about the delays in tendering (for good reason IMO!) and have started a petition to build the damn thing already: https://connectlappin.ca/
  6. smably

    Toronto Toronto | Cherry House at Canary Landing | 50.32m | 13s | Dream | COBE Architects

    Yeah, I don't get the complaints. This is really good! What's not to love — it's got interesting materials, an unusual form, texture at street level, and some actual colour. Maybe the pink precast is a bit dusty, but give it a quick power wash and it'll shine. We asked for buildings that aren't...
  7. smably

    Toronto Marlow | 113.41m | 33s | Fitzrovia | Turner Fleischer

    From tonight. Bloordale is starting to feel like part of a big city. I may have some qualms about the architecture we're getting here, but I'm genuinely excited for the liveliness that ~4000 new neighbours will bring to my neighbourhood.
  8. smably

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    This drives me crazy. Painting the new railings black would have been such an easy (and obvious) win, and yet...
  9. smably

    Toronto Toronto | 1319 Bloor West | 112.3m | 35s | KingSett Capital | Hariri Pontarini

    This one could be getting a height and girth bump via a minor variance: Now 1100 units over two phases. https://www.toronto.ca/city-government/planning-development/application-details/?id=5496155&pid=163380&title=1319-BLOOR-ST-W
  10. smably

    Toronto Toronto | Toronto House | 186.53m | 58s | Westbank | Hariri Pontarini

    The exposed aggregate look is also ubiquitous on the west coast. Lots of sidewalks like that in Victoria and Vancouver, e.g...
  11. smably

    Toronto Marlow | 113.41m | 33s | Fitzrovia | Turner Fleischer

    Yesterday morning. Damn, those bike lanes sure are causing some terrible congestion.
  12. smably

    Cycling infrastructure (Separated bike lanes)

    Anything's possible, but Doug will definitely notice if cities start doing this, and he absolutely would seek revenge in the pettiest possible way. Maybe he'll introduce follow-up legislation that bans bike lanes altogether, or maybe he'll just start denying provincial funding, cancelling...
  13. smably

    Cycling infrastructure (Separated bike lanes)

    Did they paint the pedestrian symbol on top of all that sand and road grit?
  14. smably

    Cycling infrastructure (Separated bike lanes)

    Veering slightly off-topic, but is Operations the department that (mis)manages transit signal priority? 👀
  15. smably

    Toronto Billy Bishop Toronto City Airport | ?m | ?s | Ports Toronto | Arup

    A couple of thoughts on this. One, location is important. Even with a hypothetical Eastern Gap bridge, existing island parkland wouldn't be within practical walking distance of the core. The airport lands, on the other hand, are in a prime location close to the foot of Bathurst. Two, why assume...
  16. smably

    Toronto Toronto | T3 Sterling Road | 52.52m | 11s | Hines | DLR

    The wall is a crash wall and, like it or not, is required by rail safety regulations. Not much leeway there.
  17. smably

    Highway 401 Transit and Auto Tunnel

    Somebody needs to confiscate Doug's crayons. This is getting ridiculous.
  18. smably

    Cycling infrastructure (Separated bike lanes)

    I'm curious to see the wording, but if it's as bad as it sounds, it should be ripe for a charter challenge.

Back
Top