  1. Y

    Toronto Toronto | The Forest Hill Condominiums | 60.7m | 17s | CentreCourt | BDP Quadrangle

    Work is still being done on the entrance to the LRT, and minor work within the building, but units have closed and are occupied.
  2. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I've had to replace a tire twice in the last 4 years cause of how bad it is between caledonia and dufferin
  3. Y

    Toronto Toronto | The Forest Hill Condominiums | 60.7m | 17s | CentreCourt | BDP Quadrangle

    Confirmed starbucks will be a commercial tenant in the building
  4. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    https://www.blogto.com/city/2023/12/toronto-intersection-reopens-after-years/
  5. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I feel as though we are getting close. I don’t see why Verster would let journalists into the lions den if he didn’t feel confident in an opening date in 2024. (Famous last words)
  6. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    So is Verster still providing an update this month?
  7. Y

    The Forest Hill Condominiums (CentreCourt) - Real Estate -

    How's the building so far? Are you living in or renting?
  8. Y

    Toronto Toronto | The Forest Hill Condominiums | 60.7m | 17s | CentreCourt | BDP Quadrangle

    No I meant 2023 but the timelines were pushed back. I believe first we floors of occupancy are happening this month. For sure in Q1 2024.
  9. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    https://x.com/crosstownto/status/1713332757844169081?s=46&t=v6u40moV4CNU7xGF-82huw
  10. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    My naively optimistic self thinks the Dec 2024 leak is so that when verster announces a spring 2024 opening date it will look like Christmas came early. I don’t know, but I agree with the poster above. This thing looks close to done
  11. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    anyone have the link to the dashboard?
  12. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    He said he hasn’t signed a new contract and his current contract term ends on Monday?? Did I hear that right?
  13. Y

    Toronto Toronto | Ontario Line 3 | ?m | ?s

    Akropolis will be a huge a loss. I can't read the article due to paywall. When will it be closing?
  14. Y

    Toronto Toronto | Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    What is the structure in the first picture supposed to be?
  15. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Both CEO and CCO talk as if construction is already wrapped up and are heavily focused on testing & commissioning.
  16. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    From the article it sounds like the following are true: - There is no contractual relationship between Crosslinx and the TTC - The Project Agreement’s specs dont align / are not perfectly compatiable with the TTCs operational requirements So someone on both sides missed a pretty big gap in the...
  17. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    So according to the EllisDon CEO, the construction should be completed this year. Testing and commissioning can be completed this year if ML/TTC play ball. The issue is can the parties stop fighting in order to get the job done.
  18. Y

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Unfortunate this wasn’t posted 10 days ago 🤷🏽‍♂️