  1. aquateam

    Montréal Transit Developments

    I speak french, so I am clear on what the article says. Do you think it makes any particular sense to postpone roadwork (incurring additional costs), until traffic has returned to normal levels and the construction will be maximally disruptive? On the STM's end, I see that the Cote Vertu...
  2. aquateam

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I think that the case ~15 years from now will be that all the buses will be autonomous, but the streetcars will still be manually driven. Self-driving vehicle technology (from personal cars and commercial semis) will percolate into buses. But buses have a large production volume to spread out...
  3. aquateam

    Toronto Toronto | Ontario Line 3 | ?m | ?s

    I think the parking lots around the Science Centre would be kind of wasted on an MSF. That corner of Don Mills and Eglinton is the main entrance to the Eglinton LRT: As an undeveloped corner at the intersection of two rapid transit lines, it should be packed with as many offices, residences...
  4. aquateam

    GO Transit Electrification | Metrolinx

    I think what @ssiguy2 is referring to is the extreme percentage of Canada's economy that's devoted to real estate instead of products and services compared to many other countries. All the money going into property crowds out investments in machinery and other capital improvements to...
  5. aquateam

    Montréal Transit Developments

    To my knowledge, the STM hasn't taken advantage of the pandemic to accelerate disruptive maintenance in the same way that the TTC has, which seems like a lost opportunity to me. Getting as much disruptive road and transit work out of the way when traffic and transit ridership is at a...
  6. aquateam

    TTC: Streetcar Network

    He also says this when someone suggestions an underground connection to Castle Frank for an across-the-platform link to the subway: None of these are insurmountable: the bus loop can be reinforced, and utilities can be moved for a tunnel. But it sounds like it is much more of an ordeal than...
  7. aquateam

    TTC: Streetcar Network

    💯💯💯 I was going to comment earlier that reintroducing the Parliament streetcar would be an example alternative to some of Reece's suggested streetcar extensions. I know the Parliament bus ridership isn't that high, but I think that the Ontario Line's Distillery station at Parliament/Front adds...
  8. aquateam

    TTC: Streetcar Network

    He is somewhat active in these forums. Can you elaborate on which ideas can't/won't be done? I definitely agree about replacing switches, I think the TTC is already doing that (albeit at a glacial pace.) With regards to reducing the number of switches, I think that he contradicts himself a...
  9. aquateam

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    You joke but the city created "Dunbloor" street where Bloor and Dundas intersect at 6-Points, so "Bloordas" is the logical name for where they intersect here. I like "Roncesvalles" if the street name is extended north from where it ends. That or we could name the station "Crossways."
  10. aquateam

    Toronto Regional Board of Trade Regional Rail Report

    Right now road capacity on highways is "free" to drivers. Whenever something is "free", people use it excessively. By charging to access the highway, fewer people will take it, but it will move faster (saving them time.) People who used to have no choice but to "pay" for the highway trip with...
  11. aquateam

    TTC: Other Items (catch all)

    There's one quote there that bugs me: I know we're not NYC and we're not going to get 24 hour subway service, but it's disappointing that we can't consistently rely on having full use of the subway system. Over the past five years I've frequently gone to the nearest TTC station and been caught...
  12. aquateam

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    I don't understand your point. The LPAT (I think @NoahB meant OMB) has final say, not the local community. Mid-rises 800 meters away from a station are a solid improvement considering you get significantly taller buildings built in parts of the GTA where no one uses transit. For a quality 100%...
  13. aquateam

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    I know the purpose of your post is to point out how broken the zoning is around the Eglinton West LRT extension, but it looks just as bad further south around the Bloor-Danforth line. The bigger question is: why should the yellow belt exist at all? The city needs to eliminate all legal...
  14. aquateam

    Richmond Hill Toronto | Yonge Line 1 North Subway Extension | ?m | ?s | Metrolinx

    Personally, I stick to the Transportation and Infrastructure part of the forum because it's less likely to become emotional/political, but I've seen some debates here get very heated. A few people have been banned for their behaviour.
  15. aquateam

    Toronto Regional Board of Trade Regional Rail Report

    Any kind of tax that is directed to public transit is inherently progressive. People who are very low income can't afford the $10 000 yearly average carrying costs of owning a vehicle, so they overwhelmingly benefit from fees on drivers that go towards public transit. Poor people are much better...
  16. aquateam

    Toronto Regional Board of Trade Regional Rail Report

    I think dedicated taxes for transit expansion/operation (like the conversation Metrolinx was driving back in 2016 about how to pay for the Big Move) are a great idea. They would preferably meet these 3 criteria: Be easy to collect Raise significant revenue Incentivize positive outcomes Based...
  17. aquateam

    Richmond Hill Toronto | Yonge Line 1 North Subway Extension | ?m | ?s | Metrolinx

    I don't think you can really get shallow stations once you've decided to go with a TBM. That section of the Ontario line is going diagonally under foundations and utilities (including a storm sewer), so there is limited opportunity for it to rise up. For geotechnical reasons I believe you also...
  18. aquateam

    Richmond Hill Toronto | Yonge Line 1 North Subway Extension | ?m | ?s | Metrolinx

    I think there are some clear advantages to cut and cover that deserve more than a boilerplate "it's disruptive" response. After all, it's not as though using traditional TBM construction on Eglinton hasn't been disruptive. The cost savings of C&C are well-established: During construction of the...
  19. aquateam

    Richmond Hill Toronto | Yonge Line 1 North Subway Extension | ?m | ?s | Metrolinx

    Your alignment looks like it would be much cheaper (cut and cover) and slightly faster (shorter) than Option 3. It also puts the station right in the middle of the redevelopment area instead of straddling the corridor. So I think that's an improvement. The only disadvantage I see is that you...