  1. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Good architecture pays! Other Toronto developers, take note: " 'We could have built a different building less expensively than it cost us to do it the way we did, but there is definitely an economic return in terms of the rent we can charge and the calibre of tenants we’re able to attract to...
  2. S

    San Francisco | Transbay Transit Center | 22.86m | 5s | TJPA | Pelli Clarke Pelli

    Cast steel nodes in the Transbay Transit Center's "Light Column" - an architecturally exposed structural steel feature that opens up to the Transit Center's oculus, which shines natural light from the city park level down into the underground levels of the Transit Center.
  3. S

    San Francisco | Transbay Transit Center | 22.86m | 5s | TJPA | Pelli Clarke Pelli

    Cast steel nodes in the architecturally exposed structural steel seismic force resisting system that wraps the entire perimeter of the Transbay Transit Center
  4. S

    San Francisco | Transbay Transit Center | 22.86m | 5s | TJPA | Pelli Clarke Pelli

    Architecturally exposed structural steel seismic force resisting system fitted with cast steel nodes. Photograph courtesy of CAST CONNEX.
  5. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    As I understand it, there will be a cafe atop the "hut" and a pretty swanky feature stair to access it. Personally, I can't wait to sit up there with a coffee and people (and architecture) watch.
  6. S

    Toronto Toronto | Spadina Subway Extension Emergency Exits | ?m | 1s | TTC | IBI Group

    We're still waiting for the installation of this cast steel node at the bus station entrance...
  7. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Another article on the project - http://dailycommercialnews.com/Projects/News/2015/8/New-Queen-Richmond-Centre-a-head-turner-1009766W/
  8. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    You've forgotten that Phase 2 will obscure much of that side of the building...
  9. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    It blends in more with the surroundings on Queen Street than the condos do...
  10. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    The architecturally exposed structural steel delta frames with the 17.5-ton cast steel nodes just nabbed this project a Citation in ARCHITECT Magazine's R+D Awards. Very prestigious! - see: http://www.architectmagazine.com/awards/r-d-awards/citation-queen-richmond-centre-west_o This is in...
  11. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Erection of the masts that support the atrium glass should commence in the next week or so, and the office building should be topped off by the end of the month.
  12. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Queen Ricmond Centre West - Human Scale "Human Scale" by Tarana Haque
  13. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    This photo was taken at dawn a couple weeks ago - no touch ups whatsoever.
  14. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    They have to install the entire "table top" steel and carry out all of the field welding at the node-to-pipe joints before they can fill the legs with concrete, as the unbalanced weight that results as each leg is filled from the base up 70-feet would cause some lateral movement if the steel...
  15. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    You beat me to posting this! ... Thanks for all the great coverage on this project.
  16. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    The night lifts off of Richmond St. this week were a success - next up, Delta Frame 3...
  17. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Delta Frame 1 more or less complete. Frame 2 scheduled for next week
  18. S

    Toronto Toronto | QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Yes, they are going to remove the temporary installation tabs - the steel will be seamless and appear monolithic.