News   GLOBAL  |  Apr 02, 2020
 8.8K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5K     0 

  1. S

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Thanks and No Problem! here’s a few more behind the scenes
  2. S

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Needs a good clean lower down but it’s nice and shiny up top. We’ve been gentle with it!
  3. S

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Good shots! We’ll try and work a little quicker today 😉
  4. S

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    Two people tried to go through the same section of the revolving door at once, and when it got stuck, pushed too hard.
  5. S

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    What it sits on doesn't really define what type of machine it is. Depending on how the weather cooperates it should take 1-2 weeks to climb the tower crane down and then a day or two to dismantle it.
  6. S

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    The crane at L will be dismantled in the same fashion as the 2nd at bay Adelaide. The Derrick is being installed to install the BMU once its finished.
  7. S

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    The Derrick is a 35ton machine (it won't be reeved with all its parts of line in this installation) but the tower crane is an 8/16ton machine and due to the height of L-tower, there's only enough capacity on the hoist drum for 2 parts of cable, limiting it to 8ton
  8. S

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    It's really the only option at this point, the building maintenance unit was built in pieces that are heavier than the tower crane can lift
  9. S

    Toronto Toronto | L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

    The plan is to use the building maintenance unit to remove the Derrick and platform

Back
Top