News   GLOBAL  |  Apr 02, 2020
 8.4K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.7K     0 

  1. timothe.dubois

    Toronto Toronto | 28 Eastern | 45.4m | 12s | Alterra | Teeple Architects

    Diamond Corp is about to announce plans for a 6- to 14-storey development to the immediate west of this, between Eastern, Gilead and King. Lots happening around here.
  2. timothe.dubois

    Toronto Toronto | Curio by Hilton Distillery District | 115.1m | 31s | Gupta | Arcadis

    LPAT has just approved this proposal on appeal.
  3. timothe.dubois

    Toronto Toronto | Downtown Data Centre | 38.5m | 4s | Equinix Inc | WZMH

    Confirmed with the planner: this project has been cancelled.
  4. timothe.dubois

    Toronto Toronto | 28 Eastern | 45.4m | 12s | Alterra | Teeple Architects

    Looks like they’re preparing the site for shoring. Murmurs of the long Fresh building next door getting redeveloped soon, too.
  5. timothe.dubois

    Toronto Toronto | Downtown Data Centre | 38.5m | 4s | Equinix Inc | WZMH

    Possible preliminary site prep happening:
  6. timothe.dubois

    Toronto Toronto | Cherry House at Canary Landing | 50.32m | 13s | Dream | COBE Architects

    Full-on excavation and shoring at the southwest corner. Didn’t realize how wide the laneway will be between this and the Mill St buildings — 3 or 4 times the width of an alley:
  7. timothe.dubois

    Toronto Toronto | Cherry House at Canary Landing | 50.32m | 13s | Dream | COBE Architects

    They’ve taken down the street lamps that used to dot the parking lot and started removing asphalt:
  8. timothe.dubois

    Toronto Toronto | 28 Eastern | 45.4m | 12s | Alterra | Teeple Architects

    I have a bad feeling about this design, but it'll be good to have the void filled. From Alterra's latest email blast:
  9. timothe.dubois

    Toronto Toronto | 28 Eastern | 45.4m | 12s | Alterra | Teeple Architects

    Now they start selling units, I guess?
  10. timothe.dubois

    Toronto Toronto | home: Power and Adelaide | 78.33m | 22s | Great Gulf | Core Architects

    Glass and grey spandrel is appearing on the sixth floor. Which will be good news to future residents and bad news to everyone else.
  11. timothe.dubois

    Toronto Toronto | 28 Eastern | 45.4m | 12s | Alterra | Teeple Architects

    Boxier-looking with each revision. The gimmicky corten steel can't save this poor design.
  12. timothe.dubois

    Toronto Toronto | Downtown Data Centre | 38.5m | 4s | Equinix Inc | WZMH

    Some sort of drill on site today.

Back
Top