News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
  1. G

    Toronto Ontario Line 3 | Metrolinx

    iirc there are no closures of length. They do either 1 lane overnight closures or weekend closures. nothing during rush hour
  2. G

    Alto - High Speed Rail (Toronto-Quebec City)

    Right but we also dont know which trails and roads get closed. theres a big difference in overpasses/underpasses between a 7ft by 10ft culvert and a 2 lane/4 lane road thats 3 times the size. yes Alto is saying 0 grade crossings but these concerns will be taken care of and might I add paid for...
  3. G

    GO Transit: Service thread (including extensions)

    what is someone bout to spend the $5 billion for the bypass hub or whatever its called?
  4. G

    Alto - High Speed Rail (Toronto-Quebec City)

    Thats basically it. As soon as the northern route is chosen 99% of this uproar will die down. especially when the 10m row will be publicized. people will be like. oh wait its not near me.
  5. G

    Toronto Ontario Line 3 | Metrolinx

    we have seen a few. the gerrard portal looks similar to what the TOC guys put out awhile ago. but lol at the catenary for go transit. minton portal one is new. im sure the city can come up with a better use for the park. The bridge ones have been out there for awhile
  6. G

    Exhibition Place

    ford convention center aside. This feels like it would require a big scaledown of area for the EX. same with the new hotel. There will be a point where the ex doesnt make sense anymore right?
  7. G

    Toronto Ontario Line 3 | Metrolinx

    considering the sse one got...lets call it "shelved" i doubt this will
  8. G

    GO Transit: Service thread (including extensions)

    stratford? thats new. i thuoght the point of the kw expansion was to end at vistoria station? is this a trial balloon for bringing back london service?
  9. G

    Billy Bishop Airport Expansion?

    Gotta call out chatgpt hallucinations when i see them
  10. G

    Toronto Ontario Line 3 | Metrolinx

    press conference is announcing start of tunneling.
  11. G

    Toronto BMO Field Renovations (FIFA26) | MLSE | Gensler

    This whole thing is kinda weird, a free max capacity ticketed event is what i thought it was going to be in the first place
  12. G

    GO Transit: Construction Projects (Metrolinx, various)

    ive heard people here saying it was because DB "proposed things like 1 per train operation that was never going to happen" this article makes it look like they were proposing just changing inventory software and got shot down. Were they too ambitious or did metrolinx put roadblocks in front...
  13. G

    Toronto Ontario Line 3 | Metrolinx

    LMAO what the hell did they spend 200k on lol.
  14. G

    GO Transit: Service thread (including extensions)

    much better. that would be crazy if that was true lol
  15. G

    GO Transit: Service thread (including extensions)

    OH JEEZ this is real. This is the same service levels as 2019. I did read they were shifting service to match travel but daum ignoring commuters and packed trains is a choice
  16. G

    Toronto Ontario Line 3 | Metrolinx

    where is this from? ontario line mx page still shows old names
  17. G

    Cycling infrastructure (Separated bike lanes)

    yea with a traffic divider. I can say that the amount of car traffic trying to go through portland on weekends to get to king is a little crazy so hopefully they dont do that anymore
  18. G

    GO Transit: Service thread (including extensions)

    Wasnt this the 15 min service they cut last fall? they used to have 15 minute weekend service like a year ago
  19. G

    Toronto Ontario Line 3 | Metrolinx

    https://hdr.wistia.com/medias/czrk84lfbg though i do remember someone mentioning that MX is keeping the 3rd track out until Birchmount bridge is done? Judging based off this and the bi-weekly the retaining walls are all complete on the north side. and the bridges are close to complete with...

Back
Top