News   GLOBAL  |  Apr 02, 2020
 9.5K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.3K     0 

West Edmonton Renal Dialysis Clinic
The project will convert warehouse space into a health clinic. Interior and exterior alterations include re-configuring front entrance on the east elevation, extending second floor, 1 new condensing unit on the roof. The clinic will be operated by Alberta Health Services.
Municipality:Edmonton
Sector:Institutional
Type:Health Care
Schedule:2019 - 2020
Estimated Cost:$8.8M
Stage:Under Construction
Developer:Alberta Health Services
 
Edmonton Downtown Park
The City of Edmonton is spending up to $28M to turn a number of vacant parking lots into park space. The park will measure 1.25 hectares upon completion.
Municipality:Edmonton
Sector:Tourism / Recreation
Type:Park
Schedule:Commencing 2021
Estimated Cost:$28.0M
Stage:Proposed
Developer:City of Edmonton
Related Links:Jun 4, 2019

194282

 
Nordic Spa - Parkland County
Construction of a Nordic Spa in the Edmonton region. The location within Parkland County has not been specified. There are two Nordic spas currently proposed in the Edmonton region.
Municipality:Parkland County
Sector:Tourism / Recreation
Type:Attractions
Schedule:Commencing 2021
Estimated Cost:$50.0M
Stage:Proposed
Developer:Nordik Group
 
Muttart Urban District

Construction of a new residential and commercial area near the Stadium LRT station.
Brookfield built preliminary infrastructure and sold the project to Rohit Developments.
The development will be built in 3 phases. The first phase will add 243 rental apartments, and 2,500 square feet of commercial space.

The first residents are expected to move in by the fall of 2020.

Municipality:Edmonton
Sector:Residential
Type:Community
Schedule:Commencing 2019
Estimated Cost:$150.0M
Stage:Under Construction
Developer:Rohit Group of Companies
 
@81 Mixed Use Development

Mixed-use development located just south of Whyte Avenue, on 101 Street. The Development will convert an old single storey commercial building into a four-storey building with 36 apartments, and 6 retail bay with 11,000 square feet.
Municipality:Edmonton
Sector:Mixed-Use
Schedule:2019 - 2020
Estimated Cost:$5.0M
Stage:Under Construction
Developer:Beljan Developments
Contractor:Stanley Construction
 
Muttart Urban District

Construction of a new residential and commercial area near the Stadium LRT station.
Brookfield built preliminary infrastructure and sold the project to Rohit Developments.
The development will be built in 3 phases. The first phase will add 243 rental apartments, and 2,500 square feet of commercial space.

The first residents are expected to move in by the fall of 2020.

Municipality:Edmonton
Sector:Residential
Type:Community
Schedule:Commencing 2019
Estimated Cost:$150.0M
Stage:Under Construction
Developer:Rohit Group of Companies
Is it just me or does this pricing seem soooooo off!
 
Alberta Legislature Building Restoration

The project will restore the 106-year-old Alberta Legislature Building. The project scope includes the restoration and repair of the sandstone cladding and windows.
The project will begin in the southwest corner, followed by the southeast corner, and finishing off with the north portion of the building. Project is estimated to take 3 years

Municipality:Edmonton
Sector:Institutional
Type:Administration
Schedule:2019 - 2022
Estimated Cost:$20.5M
Stage:Under Construction
Developer:Alberta Infrastructure
Contractor:Scorpio Masonry

 
The George Apartment Complex

Construction of a 4 storey, 50 unit rental apartment complex in Queen Mary Park.

Municipality:Edmonton
Sector:Residential
Type:Apartment: Low-Rise
Schedule:2019 - 2020
Estimated Cost:$8.1M
Stage:Under Construction
Developer:Highstreet Financial


201980



 
Brighton Block Redevelopment

Mixed-use office and retail space will be available in the redeveloped historic Brighton Block. The building was originally built in 1911-1912.
Municipality:Edmonton
Sector:Mixed-Use
Schedule:2017 - 2019
Estimated Cost:$5.5M
Stage:Under Construction
Developer:Primavera Developments
Contractor:PCL Construction
Project Website:https://www.primaveradevelopment.com/edmonton-brightonblock


201981



 
Ecole Joseph-Moreau

The new Ecole Joseph-Moreau will be 5,865 square meters in size and be able to accommodate 500 students between grades 7-9.

Municipality:Edmonton
Sector:Institutional
Type:School
Schedule:2018 - 2019
Estimated Cost:$14.8M
Stage:Under Construction
Developer:Conseil Scolaire Centre-Nord Schools
Contractor:Lear Construction Management Ltd.

201982

 
Enbridge Tower Hotel Conversion

conversion of the former Enbridge Office Tower to a Hotel. The hotel will feature ~300 rooms and will be split between extended stays and short-term stays. The $65-70M conversion will reduce office vacancy by an estimated 0.5%, according to Avison Young.
Municipality:Edmonton
Sector:Tourism / Recreation
Type:Hotel
Schedule:2019 - 2020
Estimated Cost:$70.0M
Stage:Under Construction
Developer:Lighthouse Hospitality
Related Links:June 1, 2018 - Global News
Jul 30, 2018 - Edmonton Journal

201983
 
Riverfront Landing Mixed Use Development
The proposed project will see a mixed-use village containing 28 and 26 storey towers along Bellerose Drive overlooking the Sturgeon River.
Municipality:St. Albert
Sector:Mixed-Use
Schedule:Commencing 2021
Estimated Cost:$500.0M
Stage:Proposed
Developer:Boudreau Communities
207012

 

Back
Top