Actually, Kahlua the glass is on the 14th floor on the east facing side of the building. (or the view visible from the webcam) - Funny they haven't installed 2 rows of glass above the historic facade to match the east facing side. The building narrows a bit above the historic facade which probably means they need to do some additional work before they can install the glass on the north facing side, above the stonework.
I also noticed they had raised the forms this morning. So we are on the 37 floor (offcially) / 36th floor (actual). -
(It'll be a lot harder to track the forms now that they are out of the webcam view- 3D can do us the favour if he chooses)
Lots of Steel columns were erected last night...The framing is now up around the 28-29th floors..so a'lil over halfway up the building.