Northern Light
Superstar
Sure, but I think then the Roselawn work is redundant and unnecessary. If it was a longer strip, sure, but in the case of extending the trail I would just do this:
View attachment 551286
And put a Bikeway on the Allen Path on the west side connecting to the new York Beltline Trail extension.
I'm not sure why you would want to force someone to divert off Roselawn, down Marlee, back up to Elm Ridge, same road, for a one block detour? You're making the trip a lot longer than necessary. If one of the 2 segments were not to be built, in the near term, to me, its the Park segment that should be deferred, because its not continuous.
Elsewise, you're also conflating different department's budgets and jurisdictional authorities.
On the subject of the existing N-S path beside the Allen on the west side; it looks like this:
Its not really wide enough for a multi-use trail, even w/zero landscaping, you've got ~3M of width there.
I'm all for upgrading it, in theory, though I'm still holding out for burying the Allen which would make the point moot.