Another University District development. 128 units with retail at main level.
Last edited:
That's what I'm thinking. I don't think they'll want to close down University Ave all the time now that Block 23 is almost finished. The entire area to the north of this parcel also needs to be demolished and then massive amounts of dirt brought in to level it out. So I suspect this will almost definitely be a temporary laneway.I would think they would wait until after construction to do any finishing in the area, but maybe they need this for delivery of materials or something.
If it were permanent they would have put in a curb and camber in for drainage before laying the surface.That's what I'm thinking. I don't think they'll want to close down University Ave all the time now that Block 23 is almost finished. The entire area to the north of this parcel also needs to be demolished and then massive amounts of dirt brought in to level it out. So I suspect this will almost definitely be a temporary laneway.