General rating of the project

  • Great

    Votes: 8 13.8%
  • Very Good

    Votes: 33 56.9%
  • Good

    Votes: 14 24.1%
  • So So

    Votes: 3 5.2%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    58
Work on the crown continues...

2016 June 2 011.JPG 2016 June 2 040.JPG 2016 June 2 043.JPG 2016 June 2 078.JPG 2016 June 2 084.JPG 2016 June 2 085.JPG 2016 June 2 111.JPG 2016 June 2 112.JPG 2016 June 2 126.JPG 2016 June 2 127.JPG 2016 June 2 130.JPG 2016 June 2 131.JPG
 

Attachments

  • 2016 June 2 011.JPG
    2016 June 2 011.JPG
    920.7 KB · Views: 249
  • 2016 June 2 040.JPG
    2016 June 2 040.JPG
    834 KB · Views: 209
  • 2016 June 2 043.JPG
    2016 June 2 043.JPG
    833.4 KB · Views: 199
  • 2016 June 2 078.JPG
    2016 June 2 078.JPG
    1.7 MB · Views: 245
  • 2016 June 2 084.JPG
    2016 June 2 084.JPG
    1.6 MB · Views: 245
  • 2016 June 2 085.JPG
    2016 June 2 085.JPG
    1.7 MB · Views: 241
  • 2016 June 2 111.JPG
    2016 June 2 111.JPG
    2.3 MB · Views: 241
  • 2016 June 2 112.JPG
    2016 June 2 112.JPG
    1.7 MB · Views: 245
  • 2016 June 2 126.JPG
    2016 June 2 126.JPG
    2.3 MB · Views: 238
  • 2016 June 2 127.JPG
    2016 June 2 127.JPG
    2.2 MB · Views: 254
  • 2016 June 2 130.JPG
    2016 June 2 130.JPG
    2.1 MB · Views: 244
  • 2016 June 2 131.JPG
    2016 June 2 131.JPG
    1.4 MB · Views: 264
It's upsetting how that nice looking atrium has to sit right beside that fugly parkade for the next while ... With no real signs that the second tower will be built at this time
 
I hope the 2nd tower is redesigned into a mixed use supertall sometime in the 2020s. Could do 30 floors of office, 20 floors of hotel, and then 30 floors of residential.
 
It's gonna be interesting watching the crown take shape.

Is that the final height then?
 

Back
Top