Active Member
https://livewirecalgary.com/2023/07...owners-frustrated-by-delayed-green-line-work/
Concerns around the Eau Claire to 16th ave portion of the Green Line.
Because they break it down by stage 1 (16 Ave to Sheppard) and within that Phase 1 and 2, it's hard to understand from some articles which portion they refer to. Is there still uncertainty on whether phase 2 (Eau Claire to 16th Ave) will go ahead? It's odd they'd tunnel all the way to Eau Claire then not connect it North, considering that tunnel is probably the most costly part.
Concerns around the Eau Claire to 16th ave portion of the Green Line.
Because they break it down by stage 1 (16 Ave to Sheppard) and within that Phase 1 and 2, it's hard to understand from some articles which portion they refer to. Is there still uncertainty on whether phase 2 (Eau Claire to 16th Ave) will go ahead? It's odd they'd tunnel all the way to Eau Claire then not connect it North, considering that tunnel is probably the most costly part.