The first floor pour seems to be coming soon.

8AC9AAAE-9B40-48DE-A3E9-BC5A6E9B7AC6.jpeg
 
It's concrete on the ground floor (because retail), and wood or modular construction above. It was originally supposed to be locally built modular construction but I think they've switched to wood.
 
They’re finally moving at a good pace...

A820AE73-ACEB-4C20-83D4-E338146DBA29.jpeg
 
Yeah it's definitely moving. Don't see them stalling.
 

Back
Top