T The_Cat Senior Member Member Bio Joined Sep 15, 2020 Messages 4,349 Reaction score 11,747 Mar 15, 2026 #1,456 I saw the frame for the south abutment of the Henday LRT bridge nearly built. I’m guessing rebar and concrete isn’t too far away.
I saw the frame for the south abutment of the Henday LRT bridge nearly built. I’m guessing rebar and concrete isn’t too far away.
T The_Cat Senior Member Member Bio Joined Sep 15, 2020 Messages 4,349 Reaction score 11,747 Thursday at 1:56 AM #1,457 Ledcor pics from @MacLac :
T The_Cat Senior Member Member Bio Joined Sep 15, 2020 Messages 4,349 Reaction score 11,747 Thursday at 1:59 AM #1,458 I'm guessing they'll cover the 23 Avenue underpass (over the pre-cast concrete) with rebar and concrete before paving. Last edited: Thursday at 2:20 AM
I'm guessing they'll cover the 23 Avenue underpass (over the pre-cast concrete) with rebar and concrete before paving.
Edmcowboy11 Senior Member Member Bio Joined Feb 12, 2019 Messages 2,791 Reaction score 10,922 City: Edmonton Thursday at 5:20 PM #1,459 Looking good, I can't wait for the south side to finish so that the road can be restored to its final or near final configuration and that the north side of the tunnel and the actual connection to the current line will begin.
Looking good, I can't wait for the south side to finish so that the road can be restored to its final or near final configuration and that the north side of the tunnel and the actual connection to the current line will begin.
T The_Cat Senior Member Member Bio Joined Sep 15, 2020 Messages 4,349 Reaction score 11,747 Thursday at 6:28 PM #1,460 Pile it on! Construction Notice – Piling work for Anthony Henday Drive LRT Bridge