Garneau2Go
Active Member
All valid, and for what it's worth I don't think the street should reopen even if i don't think it's the best location. I'd rather we commit to it and some benches and art gets added or something.
I guess what I'm trying to get at is I'm concerned that there isn't much street facing business starting up on the length of that closure even in anticipation of the east leg running, and hope the pilot isn't pulled before it gets developed? After thinking about it a bit Covid probably threw a wrench in those plans too. It's a lot of waiting on the LRT, and all i can say is that i really hope the west leg opens on time and the east gets going soon.
I guess what I'm trying to get at is I'm concerned that there isn't much street facing business starting up on the length of that closure even in anticipation of the east leg running, and hope the pilot isn't pulled before it gets developed? After thinking about it a bit Covid probably threw a wrench in those plans too. It's a lot of waiting on the LRT, and all i can say is that i really hope the west leg opens on time and the east gets going soon.