Aug 17
from the office
28458970714_e2e5cb3544_h.jpg


Sept 02
from the Water Taxi
29485510746_bb09b6484d_h.jpg


29485510606_42c352149a_b.jpg


from the L
29485510526_d28696d12a_h.jpg
 
East Tower scheduled to start in 2017

One last look - before the moon is forever blocked by the new towers....
30415846546_fa1316cc62_h.jpg
 
Oct 14
Early morning as seen from the Clinton stop
30910058960_ed48fdaf24_b.jpg

Only the healthy ones and the window washers are up
31163028161_c6c94e7ef6_b.jpg


Oct 24
Waiting for the next towers
31277702515_6323c0f511_b.jpg


Oct 28
30456246244_8e1ac5db38_h.jpg
 
Wolf Point East - Under Construction

June 29
Brutally ripping out the native growth - this stretch of virgin riverbank has not been touched for ... years.
35733495662_519aa63477_h.jpg


July 13
Drill baby Drill
35063154744_32b6a04745_h.jpg


35733493862_e07c36e6a3_h.jpg


35733492412_8937fcea75_h.jpg


35063150654_372e1845ee_h.jpg


35733490712_87061b8386_h.jpg
 
July 26
36108585142_517cb88d7a_k.jpg


36275022745_89ee43865a_h.jpg


Measure twice, drill, then measure again.
36108602342_6864196e92_h.jpg


And make sure it is plumb - always checking the plumb.
36108569632_40a0f02577_h.jpg


36108572762_8092c9aa95_h.jpg


36275019635_0813487eb0_h.jpg


Jul 28
36234243876_d8d5bb573d_h.jpg
 
Aug 9
Muddy water - more pressure to keep the walls from caving in down below where the sleeve reaches.
36890133385_3111c10e1d_h.jpg


Making sure it goes in just right
36055851124_b08e281ddf_h.jpg


The chains will hold the cage while the concrete is poured, and set.
36055849054_2119c91aca_h.jpg


Aug 28
Case is wrapping up - sheet pile is arriving.
36055845794_7b8534deb8_h.jpg
 
Sept 1

36186727374_0372c177c7_k.jpg


Some assembly required
36834185366_a74785b740_h.jpg


36214269743_f5c45f9616_h.jpg


Striking water
36851131192_7949767f35_h.jpg



36851129162_71e8571140_h.jpg


All done - the gravel fill allows the caisson sleeve to be pulled and the area graded over for the next phase.
36851125792_dce08faa8b_h.jpg
 
Sept 15

Vibrating the sheep pile to drive it in - I can hear this in my office on Clark (4 blocks down the river)
37088705402_b8bca53314_h.jpg


The guide is nailed down by the 2 smaller tubes (in back) which appear to be weleded in place. The 3 openings then have the larger tubes vibrated and pounded in.
37244672905_c1ca333910_h.jpg


37070502246_0c6a013d3e_h.jpg



Tubes that will be vibrated in, then pounded the last bit ?
37118275331_bcca888e23_h.jpg


the business end of the pounder.
37261015315_402bed48bf_h.jpg


not sure what the caps are for - would fit the big tubes
37088719432_905e87248c_h.jpg


More pieces - cut up form - I guess they are custom built on each site.
36446298713_0f1d6424cd_h.jpg


37261011395_56614eccbe_b.jpg
36446300413_d5562cea04_b.jpg
37088721272_21f088e3fe_h.jpg
37261012815_78a594dbf8_h.jpg


Our friends from Wisconsin.
37261010095_78b5397c74_h.jpg
 