The curve at Kennedy was to be scrap and replace with an at grade level.As noted and linked above, the TTC estimated in 2006 that the shutdown would only be 8 months. And the bigger issue was the curve at Kennedy station.
Also there's nothing that ever precluded the TTC issuing a tender for vehicles that could take the existing curve.
As for the tunnel, it was going to be more than 8 months and comes from the person who first proposed the system as well help to design the system in the first place. There were many meetings on it.
Why would you replace the existing fleet and system with something that was the same with the same failure rate at twice the cost, if not more?? Unless you were to extended like it was supposed to be in the 80's as well elsewhere, it would be a waste of money..
You think the LRV's are pricey, those new Mark X cars would way more costly, let along updating the system to a true driverless system.