The current scope of engineering work includes the design and construction for the replacement of the Duggan Bridge, and the road rehabilitation of Saskatchewan Drive from 106 Street to 107 Street. The detailed design of the bridge and road was completed in fall 2020.
The new bridge will be a single span with steel girders supporting a concrete deck. The bridge will carry the same 2 lanes of traffic with a sidewalk to the south. The sidewalk on the north will be changed to a 4.2 metre wide shared-use path. A pedestrian lookout will be constructed as part of the bridge.
Duggan Bridge Replacement
The new Duggan Bridge is expected to open in late 2021. Some minor finishing work and the landscaping will be done in spring 2022.
www.edmonton.ca
Duggan Bridge Replacement Project
Project will replace the aging Duggan Bridge in Edmonton, along Saskatchewan Drive between 106 Street and 107 Street.A shared use path will be built on the north and south side of the bridge.
Municipality: | Edmonton |
Sector: | Infrastructure |
Type: | Roadwork |
Schedule: | 2021 - 2022 |
Estimated Cost: | $9.0M |
Stage: | Under Construction |
Developer: | City of Edmonton |
Duggan Bridge Replacement Project
Project will replace the aging Duggan Bridge in Edmonton, along Saskatchewan Drive between 106 Street and 107 Street.A shared use path will be built on the north and south side of the bridge.
majorprojects.alberta.ca