As of Nov 27, the area was dead as a door nail.
Love the old posted notices for the Railpath as the sign said the the Railpath would be close in 2022 and reopen in 2023 considering we are at 2025 with it still close. Maybe the new entrace will be open to the station by 2027 as it still has a lot of work to be done on it and no idea if the elevator is even working.
Until that entrance is open, work to install Track 1 cannot happen this year to Q2 2026. They may close the the current entrace and force riders to walk to Bloor St entrance as well the pedestrians heading to TTC or the plaza by using the Wallace overpass.
Track 1 partly lay north of Wallace Overpass in roughshape and see nothing south of Bloor for it.
Some photos in my backlog for the area and no idea when I will get to them.
Love the old posted notices for the Railpath as the sign said the the Railpath would be close in 2022 and reopen in 2023 considering we are at 2025 with it still close. Maybe the new entrace will be open to the station by 2027 as it still has a lot of work to be done on it and no idea if the elevator is even working.
Until that entrance is open, work to install Track 1 cannot happen this year to Q2 2026. They may close the the current entrace and force riders to walk to Bloor St entrance as well the pedestrians heading to TTC or the plaza by using the Wallace overpass.
Track 1 partly lay north of Wallace Overpass in roughshape and see nothing south of Bloor for it.
Some photos in my backlog for the area and no idea when I will get to them.