Winter Lights
Pumpkins are composted and eggnog is in the dairy aisle. That means it’s to add a healthy dose of holiday brightness to combat the long nights. Christmas lights have been installed throughout Littlewood Park, near the former air traffic control tower, making evenings a perfect time to stop by the neighbourhood.
Pandemic-related supply chain problems have caused some delays in the complete installation of new winter-themed amenities in Littlewood Park, like the new warming hut, but stay tuned for updates in coming months! |
|
Construction Update
Falling snow marks another seasonal shift, as outdoor construction slows or moves indoors. This year was a busy one in the neighbourhood. In addition to the home builders working on site, crews landscaped and added touches to Littlewood Park. Construction also continued to lay the groundwork for upcoming development, with utility installation and new roads for the next stage of residential development.
As the freezing temperatures settle in, the Blatchford Redevelopment Office is focusing on detailed design for upcoming stages, both on the west side and along the eastern side, including the work servicing the NAIT campus expansion. The City of Edmonton’s LRT team continues its work on the Metro Line expansion, which is expected to be open in 2024/2025. |
|
LRT Update
The new LRT line will have two stations in Blatchford: the NAIT/Blatchford Market Station located near the future town centre and Blatchford Gate to the north. It will be a high-floor style of train, with “urban” LRT design features, including embedded rail in certain roadways, to create a more seamless interface. Once the LRT line opens, direct pedestrian and cycle routes will safely connect the neighbourhood to the rest of the city.
On the east side of the site, work will continue through the winter on the complex to house equipment to power the LRT system. Once complete, this building will feature LED-backlit glass panels and be part of the new NAIT/Blatchford Market plaza.
Crews have started installing the concrete trackway, which will be completed next year, with rail installation to follow.
This year, crews completed the foundations, erected the structural steel that will hold the station canopies and are installing the precast platform panels.
For more information on the Metro Line NW LRT, visit edmonton.ca/metronw. |
|
Community Energy TEDx Talk
With recent talks in Glasgow, it’s easy to see climate change as an international problem. But even if global progress is slow, change is happening on local scales.
To see what’s happening in Blatchford, it’s worth checking out a Blatchford TEDx Talk from this summer. Christian Felske, who leads the Blatchford Renewable Energy team, talks about how climate change is a city problem. It's not asking people to fight their surroundings to make "sustainable choices," it's making those surroundings better to begin with.
“If cities are going to thrive, they need to be smarter,” Felske says. “They need to waste less and be strategic about growth. We have to rethink the energy equation in all aspects of our lives."
Blatchford's utility combines two key technologies identified by the International Energy Agency and climate groups. Heat pumps allow Blatchford to tap into an unlimited renewable thermal energy source, while Blatchford’s district energy system moves that energy around and allows buildings to balance their needs.
All this means it’s possible to heat and cool homes without having to burn anything. It’s just one part of Blatchford’s design for climate resilience, which includes higher density housing, higher efficiency standards, and increased mobility options. |
|
If you want a community that grows with you, and for you, find more information about builders and homes by visiting our website. |
|
|
|
Copyright © 2021 Blatchford - City of Edmonton, All rights reserved.
You are receiving this email because you opted in to the Blatchford newsletter. By providing your email address, you consent to receive th |
|
|
|
|