IanO
Superstar
Man it will be nice to have that wrapped up... it's been the better part of a decade.
Game changer for me to have that sidewalk open.I'm pretty sure that sidewalk and one lane of 104 Ave has been closed for about that same length of time.
Yes, with construction and barriers still on two sides it is really not 100% up and running yet. I think when it is accessible from all sides, it will become more connected and improve a lot.I think it will do wonders for making the ICE District not feel like a NE Downtown fortress.
BG block to be called/referred to as 'Connect Centre'.
And if they eventually plop a tower on top….name remains the same?BG block to be called/referred to as 'Connect Centre'.
lol that sounds like the name of a sad suburban business park.BG block to be called/referred to as 'Connect Centre'.
The Canadian Icehouse is expected to open this spring