archited
Senior Member
From the signage it looks like Beljan is managing their own construction -- "Belvan"
No, that is a separate contractor who is working on one of the tenant fit outs.From the signage it looks like Beljan is managing their own construction -- "Belvan"
2023-09-18 |
Commercial Final |
To construct Interior Alteration to add retail space within an existing commercial building (Station Park - phase 1) - The Come Up. |
111, 8115 - GATEWAY BOULEVARD NW |
the space north of that blank wall is where the sea can units get placed on the foundations that are spray there. they will provide additional retail options at grade as well as having patio space on top accessible from epic (you can see the doors in that blank wall).Is the plan to just have this be a big blank wall facing Whyte Ave on the main level? This already differs so much from the original renders that I have no idea what they're doing.
the space north of that blank wall is where the sea can units get placed on the foundations that are spray there. they will provide additional retail options at grade as well as having patio space on top accessible from epic (you can see the doors in that blank wall).
there's actually quite an evolution between that one and this one... in the original concept the main structure was also being constructed with three floors of "stacked" sea-cans. this proved to be more problematic than initially hoped for with the lack of interstitial and shaft spaces for servicing so what you see is much more conventional and the second and third floor configurations are also much different that what was initially contemplated (ie they're both actual full floors that ultimately attracted a single tenant) as opposed to the micro spaces that were originally contemplated (and maintained on the ground floor albeit with demising and not seacans).Page 2 of the Skyrise site this thread.