What do you think of this project?

  • I neither like nor dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    49
Concord?
But also when a render comes out then we would love to see it
ALSO Can a toronto developer finally build a project
We have seen the toronto developers proposes some tower lookin good then 3-4 years later Throw it right in to the trash
*Cough* Lamb *Cough*
 
It is going to be rental not condo, which when planned as rental doesn't see a developer exit as frequently like Lamb did on a condo project. As an aside, Concord is Vancouver based and does very little outside of Vancouver.
 
It is going to be rental not condo, which when planned as rental doesn't see a developer exit as frequently like Lamb did on a condo project. As an aside, Concord is Vancouver based and does very little outside of Vancouver.
Surely you don't mean Concord Pacific out of Vancouver - as they are building everywhere in Canada BUT Edmonton. https://www.concordpacific.com/communities/
 
Permit Type
Major Development Permit
Permit Class
Class B
Permit Date
Mar 14, 2022
Status
In Progress
Description of Development
To construct 2 Multi-unit Housing buildings with 229 Dwellings (STADIUM YARDS PH-2 AREA 3).
Address
8450 - 106A AVENUE NW
Further to that, it was already approved and is now on notice!

Major Development Permit
Reference Id:Job No 411454341-002
Description:To construct 2 Multi-unit Housing buildings with 229 Dwellings (STADIUM YARDS PH-2 AREA 3).
Location:8450 - 106A AVENUE NW
Plan 1723564 Blk 8 Lot 10
Applicant:NORR ARCHITECTS ENGINEERS PLANNERS
Status:On Notices
Create Date:2021/10/15
Neighbourhood:BOYLE STREET
Issue Date:2022/03/14
Class Of Permit:Class B
Notification Start Date:2022/03/22
Notification End Date:2022/04/12
 
Further to that, it was already approved and is now on notice!

Major Development Permit
Reference Id:Job No 411454341-002
Description:To construct 2 Multi-unit Housing buildings with 229 Dwellings (STADIUM YARDS PH-2 AREA 3).
Location:8450 - 106A AVENUE NW
Plan 1723564 Blk 8 Lot 10
Applicant:NORR ARCHITECTS ENGINEERS PLANNERS
Status:On Notices
Create Date:2021/10/15
Neighbourhood:BOYLE STREET
Issue Date:2022/03/14
Class Of Permit:Class B
Notification Start Date:2022/03/22
Notification End Date:2022/04/12
The real question is that when the DP is issued, how long do they wait to submit the building permit?
 
Better if it was 1-year with a further fee for an extension in two 6-month increments. Ideally these should be linked -- Zoning Change conditional on a Development Permit in turn conditional on a Building Permit (or at least Demolition Permit conditional on a Foundation Permit). The City would have to amp up its approval processes to match deadlines -- but that would be good for development anyway.
 
Rohit would not be an obtaining a DP if they weren't going to start building relatively quickly afterwards. Not an issue at this site.
They could easily wait to submit the BP - that happens quite often with big projects. Didn't someone say they were focusing on other development sites before starting this next phase of Stadium Yards?
 
They could easily wait to submit the BP - that happens quite often with big projects. Didn't someone say they were focusing on other development sites before starting this next phase of Stadium Yards?

Yes I was told from someone there a few weeks back that they are moving on to a couple of Strathcona projects for now.
 

Back
Top