What do you think of this project?


  • Total voters
    60
Zipping up

188378
188376
188377
 
PERMIT_DATE July 05, 2019
JOB_CATEGORY Commercial Final
ADDRESS 100, 10220 - 103 AVENUE NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct Phase 2 of a 66-storey mixed use building (Stantec Tower E)(Storeys 31-66 plus mechanical levels)
BUILDING_TYPE Mixed Use (522)
WORK_TYPE (01) New
ZONING AED, AED
 
@Daveography was that permit made to finish construction? Sorry but I'm not quite sure how these permits work yet lol
 
PERMIT_DATE July 05, 2019
JOB_CATEGORY Commercial Final
ADDRESS 100, 10220 - 103 AVENUE NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct Phase 2 of a 66-storey mixed use building (Stantec Tower E)(Storeys 31-66 plus mechanical levels)
BUILDING_TYPE Mixed Use (522)
WORK_TYPE (01) New
ZONING AED, AED

This is for an outdoor hot tub on the 30th level of Tower E.
 
I know this has been mentioned numerous times but what can be done to improve the appearance of the east side of Stantec. That grey elevator shaft looks horrible and unfinished. Couldn't they have continued the blue glazing over it. It looks like a 'band aid". Any thoughts or ideas what they could do on that side to improve it? Looks very ackward and unprofessional. I have no other issues with the building other than that.
 

Back
Top