MacLac
Senior Member
I don’t see them citing a source. These are the words the author uses…..2 towers at once is all I see
There is a subscript 1 at the end of the paragraph, and a list of references at the bottom of the article.I don’t see them citing a source. These are the words the author uses…..2 towers at once is all I see
I might do that (especially in light of what Avenuer said); but since MacLac had made that statement before the report was posted, I wasn't sure if he was going off of that report as well, or if he knew something that we didn'ti would think rather than parsing footnotes and sources and assigning/interpreting intent, it would be just as easy to call qualico or ledcor and just ask them directly…
My info is direct from the Building Permit, for what it's worth.I might do that (especially in light of what Avenuer said); but since MacLac had made that statement before the report was posted, I wasn't sure if he was going off of that report as well, or if he knew something that we didn't
Beautiful, that's exactly what I was hoping to hear. Thank you!This just posted today from Qualico. Both towers will be constructed. “In February 2022, construction began on phase two, which will feature two of six planned mixed-use apartment buildings designated for the site. The first two residential buildings will contain more than 600 apartment units, built atop a four-level commercial podium featuring a mix of small businesses, retail, conference, and community spaces.”
Also interesting that Ledcor being the GC is in a joint venture in developing this.
Designing Edmonton’s First Downtown Master-Planned Community
Catch up on the latest news from Qualico - the work we are doing and the positive impact we're having on the communities we serve.www.qualico.com
This just posted today from Qualico. Both towers will be constructed. “In February 2022, construction began on phase two, which will feature two of six planned mixed-use apartment buildings designated for the site. The first two residential buildings will contain more than 600 apartment units, built atop a four-level commercial podium featuring a mix of small businesses, retail, conference, and community spaces.”
Also interesting that Ledcor being the GC is in a joint venture in developing this.
Designing Edmonton’s First Downtown Master-Planned Community
Catch up on the latest news from Qualico - the work we are doing and the positive impact we're having on the communities we serve.www.qualico.com
Ledcor does have a properties division. They're an insanely diversified company. Build everything from towers to pipelines, operate tug boats and barges, and even run their own airline (Summit Air).Also interesting that Ledcor being the GC is in a joint venture in developing this.
I had no idea they owned Summit, that’s neat!Ledcor does have a properties division. They're an insanely diversified company. Build everything from towers to pipelines, operate tug boats and barges, and even run their own airline (Summit Air).
Wow looking at the possible renderings again, think about how much a fully developed Station Lands right beside Ice District phase 2, Northern edge of downtown is going to feel completely different in the best way possibleThis just posted today from Qualico. Both towers will be constructed. “In February 2022, construction began on phase two, which will feature two of six planned mixed-use apartment buildings designated for the site. The first two residential buildings will contain more than 600 apartment units, built atop a four-level commercial podium featuring a mix of small businesses, retail, conference, and community spaces.”
Also interesting that Ledcor being the GC is in a joint venture in developing this.
Designing Edmonton’s First Downtown Master-Planned Community
Catch up on the latest news from Qualico - the work we are doing and the positive impact we're having on the communities we serve.www.qualico.com