jcam
Active Member
The left hand doesn't know what the right hand is doing at ML. I'm totally expecting them to announce the RFP is being delayed again to remove the vehicle from the bids. The cynic in me is saying this is intentional, to ensure this project never gets built.
I believe it was that they wanted an option added to the existing bids, rather than a new bid.