West side of bramalea go platform is closing feb 10 and the east side is opening.
Screenshot_20200129-134655_Chrome.jpg
Bramalea_map_Jan.2020.jpg
 
There was some discussion during the Q and A of road-rail grade separations on the LSW line in Burlington at this week's town hall in Burlington. I don't have time at the moment to provide a time marked link so I can update this post later. If anyone else wants to please go ahead.

 
^ that's the one referenced. Apologies, I should have said "grade separation". Someone asked why it's taken so long to get started because Burlington put up the cash for it ($50 million). The response was basically they needed to rework the construction method. The previous method would have seen train service delayed by 20 minutes.
 