As drum mentioned, Metrolinx is clear-cutting the Georgetown south corridor alongside the West Toronto Railpath. With spring now here the extent of the damage is now becoming clear. North from Bloor GO:
|
|
|
not from what I know. But good that negotations resumed.That's only one of the station locations. I thought at the time they were looking at another property nearby instead. Didn't we discuss that here back somewhere when that article came out 18 months ago?
Looks like they are still negotiating ... a recent article in http://www.oshawaexpress.ca/viewposting.php?view=4590 says negotiations resumed a week after the November 2011 pull out.
I realize this might not be construction work from GO Transit, but here are some pictures of the work being done in the CN Silver area (Georgetown). It looks like the GO yard in Georgetown will get new access and the bridge over the Credit River will have three tracks. The pictures were taken by Tim Ball.
I'm really surprised nobody has been killed crossing Hurontario at Cooksville GO yet.The walkway bridge over Burnhamthorpe at the Erinadale Station was removed this week.
No idea where that bridge will be used other than at Cooksville GO station that is badly needed today.
Don't know when the plan was change for the removal of the bridge as the bridge was part of the structure.
Traffic lights will be use to allow riders to cross there now.
I said Sept for 20When are they building a GO building at Square One? Will it be near the current temporary one? Wouldn't it make more sense to build one big new terminal for both MT and GO, since the current MT terminal is kinda small?
And when will 20 be extended to Erindale GO?
If they're building new, they ought to relocate closer to Hurontario, maybe the City Centre/Robert Speck/Square One Drive area. Then they don't have to worry about any sort of Square One detour for LRT. It's a long walk to the mall, though; they might have to put in a tunnel with a Movator.
I found out why the bridge at Erindale Station was removed. It was structural unsound. I wonder when they found that out, as it was plan to stay there after construction. At the scrap yard now.
The talk about a terminal at Sq One is only building a fare office and removal of the temporarily one.
MT will be running service to the new bus terminal in September for Erindale with 20 20 being extended there from Sq One. 38 maybe going into that terminal as well and still under review.