News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

while I cant say for sure if thats the timeline, I do know that it was promised that 2-way service wouldnt start until after electrification was done. something to do with the diesel engines.
 
Some more Guelph progress... Can't be said enough how much the full length canopy makes the station feel much more substantial.

PXL_20230426_234822045.jpg
 
April 20
More up on my Site for Agincourt as noted in my last posting

With this now mostly completed, it will be a few months before I do one more trip to the station and cross it off my following list and depending when the east platform goes into service.
52860065434_39ef8f485e_b.jpg

52860065669_5cee706e3e_b.jpg

52859312347_eba92f3c23_b.jpg

52859312422_ca13f9705c_b.jpg

52860065764_2f3bd13974_b.jpg

52859890726_283e7d1694_b.jpg

52859890726_283e7d1694_b.jpg
 
April 20
More up on my site for Milliken Station

As I stated in my last posting on the 20th, the east platform is ready to be put into service with riders using the stairs and elevator from the parking lot to/from it. Once work is done for the Steeles entrances, there will be 2 more stairs and elevators to get to either of the 2 platforms

One or 2 more trips before I close the book on this project.
52860511329_8123670696_b.jpg

52859755982_d37a136337_b.jpg

52860338536_467b35249b_b.jpg

52860338621_ef5d3ac4e6_b.jpg

52860726710_9b5b65c5c1_b.jpg

52860339031_0ed1c02e61_b.jpg

52860726965_294323f89c_b.jpg

52860780258_cfff951066_b.jpg

52860727100_1b1e85815f_b.jpg

52860512334_ff723626f3_b.jpg
 
April 20
More up on my Site for Agincourt as noted in my last posting

With this now mostly completed, it will be a few months before I do one more trip to the station and cross it off my following list and depending when the east platform goes into service.
52860065434_39ef8f485e_b.jpg

52860065669_5cee706e3e_b.jpg

52859312347_eba92f3c23_b.jpg

52859312422_ca13f9705c_b.jpg

52860065764_2f3bd13974_b.jpg

52859890726_283e7d1694_b.jpg

52859890726_283e7d1694_b.jpg
Thanks for the updates Drum. I plan to walk the line from Kennedy, I was going to do it this winter but the ongoing construction at Agincourt and Milliken held me back. We're into growing season when I do ravine and shoreline walks, so I'll probably push this to the fall now.
 
Thanks for the updates Drum. I plan to walk the line from Kennedy, I was going to do it this winter but the ongoing construction at Agincourt and Milliken held me back. We're into growing season when I do ravine and shoreline walks, so I'll probably push this to the fall now.
looks like from the last photo the need to realign a section of platform track. hopefully not as big of a job vs the crosstown fiasco lol
 
looks like from the last photo the need to realign a section of platform track. hopefully not as big of a job vs the crosstown fiasco lol
That will be taken care when the missing section is install as well the full realignment of the west track when the east platform goes into service in the next month or 2. That used to be the mainline before construction started. The track work for the northbound south of the platform not completed.

The bridge track been in place since first installed to allow the building of the east platform.
 
April 20
More up on my site for Milliken Station

As I stated in my last posting on the 20th, the east platform is ready to be put into service with riders using the stairs and elevator from the parking lot to/from it. Once work is done for the Steeles entrances, there will be 2 more stairs and elevators to get to either of the 2 platforms

One or 2 more trips before I close the book on this project.
52860511329_8123670696_b.jpg

52859755982_d37a136337_b.jpg

52860338536_467b35249b_b.jpg

52860338621_ef5d3ac4e6_b.jpg

52860726710_9b5b65c5c1_b.jpg

52860339031_0ed1c02e61_b.jpg

52860726965_294323f89c_b.jpg

52860780258_cfff951066_b.jpg

52860727100_1b1e85815f_b.jpg

52860512334_ff723626f3_b.jpg

Thanks for the posts! I take the Stouffville line occasionally so it's nice to see these become actual train stations instead of just a piece asphalt with some bus platforms. Now if only the all the day service comes back soon... and the 2nd track is actually completed. I don't think people realize how much this would change things in this area if we get actual real regular all day service.
 
Has there been any sign of mobilization tofinish the creek bridges?

- Paul
Looking at the google Map, it shows the piers are in place and something long on the west side where the new bridge is to go in. This is for both bridges to the south. Not much for the bridge under CP tracks

They are doing track work between CP and the first pier. No idea how old the 2023 map is and always wonder about this until now.
 
Thanks for the posts! I take the Stouffville line occasionally so it's nice to see these become actual train stations instead of just a piece asphalt with some bus platforms. Now if only the all the day service comes back soon... and the 2nd track is actually completed. I don't think people realize how much this would change things in this area if we get actual real regular all day service.
Once there is all day service with 15-30 minute service along with fare integration, the GO system will offer a better way to travel than we can do today.
 
Looking at the google Map, it shows the piers are in place and something long on the west side where the new bridge is to go in. This is for both bridges to the south. Not much for the bridge under CP tracks

They are doing track work between CP and the first pier. No idea how old the 2023 map is and always wonder about this until now.

Close-up images from the above link:

Image 1: from the southern limit of new track:

1682974730978.png


Image 2 from the southern limit of the above, southward:

1682974813631.png


Image 3, to the twin track to the south:

1682974895570.png


Total gap between complete tracks ~ 150M
 
Once there is all day service with 15-30 minute service along with fare integration, the GO system will offer a better way to travel than we can do today.

Yeah, it will definitely be much more convenient, hourly train service off peak isn't exactly ideal but it's something. But if it actually becomes every 15 minutes they really need to start grade separating the tracks across road crossings in Markham. I live nearish to the tracks and even at all day service at 1 hour I feel like I end up encountering the train pretty regularly on the roads because it's basically 2 trains an hour, meaning one will cross every 30 minutes. At 15 minutes you're talking about one train crossing every 7.5 minutes. Traffic is bad enough here and while more GO service has benefits, it won't help with local traffic.
 

Back
Top