News   GLOBAL  |  Apr 02, 2020
 9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.2K     0 

Ottawa's line 2 is single tracked and it runs every 12 minutes. More frequent passing tracks enable more frequent service.

The number of km of track added according to the press release indicates that the corridor will have a considerable amount of quad track, albeit with some triple track pinch points (presumably Brampton station and the Credit River bridge). There have been actual Metrolinx track maps posted in this thread.
Understood, thanks, just as long as there is more capacity.
 
Better factcheck against the 2021 Business Case Analysis for the Kitchener line.

The service plan headway was only hourly 2WAD west of Mount Pleasant, and 30 minutes headway east of there. Intensive 2WAD only begins at Bramalea, because that's as far as ML is permitted to electrify.

I'm sure this plan has been revised, and one way headways at peak especially will be better....but this is a case where ML's publicity arm is creating an expectation way beyond what the track designers and funders are committed to.

- Paul

PS; As someone who regularly spends 2 hours on the 401 trying to travel between Waterloo and Etobicoke, all I can say is, we could have had, and ought to have had, 30 minute or better 2WAD headways a long time ago. They have come - but you haven't even built it yet.
 

Back
Top