cplchanb
Senior Member
similar to the situation with the roadworks on 16th ave across from the former buttonville airport. its taken so long to construct that the brand new short stubby street lights designed based on the run way restrictions areBuilding only a single platform in the first phase made sense way back in the early 2010's when the station was originally designed, but now that construction has been delayed it seems that the station would open around the same time as the double track anyway. Failing to include the second platform in the first phase of the GO station construction could result in a similar situation that we had at Milliken station where a second track was built through the station, and then immediately demolished without ever having served a train to make room for construction of a second platform.
obsolete before they even get a chance to power on since theres no longer any airport.... sad how slow things are here..