bpbpbpbp
New Member
Aren't they already having to demolish the nearby office building just to get the third track in there?
Or we could work with CN to build the Missing Link/ 407 freight bypass and give MX access to all three tracks and operate the Kitchener line similarly to the LSW line. Express service, etc.
I still don't fully understand how the recent track sharing agreement on the Kitchener line between CN and GO is suppose to work.
Yup 8 Nelson St W is probably going to be gone for the third track.
I too don't completely understand how that agreement will work, my main concern is if and how MX will have access to two tracks, or if the third Downtown Brampton track will be in a sort of "passing" configuration, with trains going in both directions using that track.
As for the missing link proposal, it sounds absolutely amazing having a triple track corridor upto Georgetown. But the project doesn't seem feasible or very likely at this point, and with the CN land acquisition agreement, that seems kind of dead.
I do think that potentially some time in the future there will be *a* missing link built to get CN off the Halton for a future HSR route into Southwestern Ontario via Kitchener and London. In this case, a fourth track would be necessary to keep two for GO and two for HSR. A project like that would necessitate CN moving, and it would be the feds funding it, not the province. I'm wondering if anyone at MX has considered this.




