AlbertC
Superstar
Aug 17, 2020
|
|
|
Had a nice conversation with the GC here this morn; I had forgotten (or perhaps never known) that these are passive house designs. He said in the depths of winter when it was pushing -20C, they had one of the homes fully enclosed but not yet heated, and it was hovering around 0C; it's sitting on a foam core bridge that insulates against the concrete pad on which it sits to reduce heat loss/cold transfer, and the walls have at least 7 inches of insulation between the vapour barrier and the exterior cladding. Also said the University's ambition is to do *37* more of these around the campus, which is just lovely.
He also marvelled at the fact that the University is paying his company to do three homes here in the same amount of time that it typically takes them to do 100 suburban sprawl homes. There's lots wrapped up in that.
I wonder if they are using German triple pane glazing for this. I can imagine they can speed up construction considerably with a panelized designs.
AoD
Had a nice conversation with the GC here this morn; I had forgotten (or perhaps never known) that these are passive house designs. He said in the depths of winter when it was pushing -20C, they had one of the homes fully enclosed but not yet heated, and it was hovering around 0C; it's sitting on a foam core bridge that insulates against the concrete pad on which it sits to reduce heat loss/cold transfer, and the walls have at least 7 inches of insulation between the vapour barrier and the exterior cladding. Also said the University's ambition is to do *37* more of these around the campus, which is just lovely.
He also marvelled at the fact that the University is paying his company to do three homes here in the same amount of time that it typically takes them to do 100 suburban sprawl homes. There's lots wrapped up in that.
I'm looking forward to these becoming modular in a few short years time, greatly reducing cost and time and becoming feasible for more homeowners to engage in.How does this speak to the financial feasibility of laneway housing being a financially viable option for homeowners that own properties zoned for this?
I'm looking forward to these becoming modular in a few short years time, greatly reducing cost and time and becoming feasible for more homeowners to engage in.
How does this speak to the financial feasibility of laneway housing being a financially viable option for homeowners that own properties zoned for this?
Well it couldn't be laneway housing because there is only so many laneways in the City of Toronto.Laneway housing as it's currently conceived as-of-right in Toronto is really a niche public policy play; it is possible only in a portion of the city according to a very specific set of criteria; if the City wanted to get serious about laneway housing being a practical way to inject hundreds of units of supply into the market every year, it would have to take a dramatically different approach.
Well it couldn't be laneway housing because there is only so many laneways in the City of Toronto.
While planning these houses, the University of Toronto also considered their sustainability and energy performance.
“The goal is to be as energy efficient as possible. We were hoping for net zero, I don’t think we’ll be quite there but, we will be close,” Macdonald said. The homes will include solar panels to support this idea. It will also include a unique feature that was not originally predicted.
According to Macdonald, the three pilot homes will will be partially heated using geothermal energy. An ‘earth-tube’ will go down into the soil, where it will, “act as a moderating influence on air temperatures.” Earth-tubes were recommended by the architect of the project, as a sustainable alternative to fossil fuels because the earth is naturally warmer during winter, and cooler during summer. The integration of geothermal energy will allow for smaller, more efficient heating and cooling systems in the homes.
Earth-tubes would not have been possible if U of T hadn’t demolished a nearby house, leaving a big hole in the ground.
“It’s possible that future builds will not have that same opportunity,” Macdonald said, “but because we had it there we thought we would try it.”
Panel construction, which minimizes construction noise, is another unique feature of this development. According to Macdonald, finding a contractor who was comfortable with panel construction was, “tricky.”
“It’s essentially constructed of panels that kind of click together. They’re all pre-purchased, pre-assembled, and brought to the site…It all kind of snaps together as if it was a big Lego project, and then from there, the interior gets built,” Macdonald said.
The University of Toronto plans on building 30-40 more laneway homes after they receive feedback from the three pilot homes. According to Macdonald, it will take a year for feedback on the energy performance of the homes, and a few months for the design.