News   GLOBAL  |  Apr 02, 2020
 9.7K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.5K     0 

34 is poured! Only one more floor to go, or two if they are going with the design that looks to have an amenity space on 36 with the mechanical.

Officially Ottawa's second highest floor count until Dream Lebreton tops out!

1000023926.jpg
 
I was going to try to take a picture on Sunday coming back to Ottawa from cottage country on the 5 in Gatineau but could not due to a car beside me that may have pulled me over but damn, this building sticks out from that view point and from many others in the city.
 
I need to go to Chemin des Terres in Gatineau to get a good look at the recent changes to our skyline. Maybe when Relevé is topped-out.
 
A couple from yesterday. They are working incredibly fast on the penthouse, this morning the roof of it was almost complete. This one has officially topped out, and is now the second tallest building in Ottawa after Icon!

DJI_0275.jpg
DJI_0278-HDR.jpg
 
3A144359-E78E-4EBA-8326-83722ACEE0DC.jpeg


Taken on April 26th. It is quite imposing from the North. It screams for similar height or taller buildings around it (I mean other projects and not just the other Lux towers)
 
Last edited:

Back
Top