Hi Joe,
I am going to submit my 30 day form this week. Most of the works to do are touch up on the ceiling and walls (there is still touch up in the ceiling from my pdi which is not yet done, of which i will also include in the 30 day form). There are 3 concerns that I dont know if these are valid to be included;
1. the laminate floor when entering my bedroom from the washroom is like has an uneven subfloor (it sounds everytime i stepped on it). i heard from other people that this is due to changes in temperature?
2. there are some works to be done in my balcony like touch up on the water exit/drainage and even the wall. I heard balcony is a common element.
3. I can hear people walking and talking in the hallway.
What do you think? Do i have to include these?
Leave out #3. All units can hear people talk from the hallway.