I read the report but I dont understand the current zoning? I thought it was already a DC site? How is this different?Century Park rezoning application going to EDC on November 18, 2025:
View attachment 694297
View attachment 694298
I read the report but I dont understand the current zoning? I thought it was already a DC site? How is this different?Century Park rezoning application going to EDC on November 18, 2025:
View attachment 694297
View attachment 694298
It is but with limitations based on older, more prohibitive guidelines. Increased density, height of towers is the main change I understand. I don’t remember what the street plan was previously.I read the report but I dont understand the current zoning? I thought it was already a DC site? How is this different?
I'm not 100% current on code interpretation but if the first floor ceiling/second floor floor is concrete and provides a 4 hour fire separation, I think you could do a six story frame structure on top of it... Elevator shafts and other penetrations would need some interesting detailing - possilbly fire shutters and/or? - but I think it would be possible. It's not dissimilar to what was done "in the field" when four storys was the maximum height for frame construction.A seven story stibutck frame instead of a 6!!![]()
![]()
East of Gateway BLVD and the tracks…..by the Eco Recycling Center? Between the tracks and PCL’s HQ? That lot?
| Status | Approved |
| Permit Date | Sep 29, 2025 |
| Neighbourhood | CORONET INDUSTRIAL |
| Address | 10110 - 51 AVENUE NW |
| Legal Description | Plan 0721428 Blk 13 Lot 31 |
| Description of Development | To construct exterior alterations for the purpose of site regrading for future Surface Parking lot and new building, reference development pre-application meeting #625355930-001. |
| Zoning | DC,BE |
51 Ave east of the CPR tracks on the north side has a bunch of earth movers and equipment flattening out the site. This has been empty for seems forever. Could not see a sign describing what is getting built though.
| Major Development Permit | ||||||||||||||||||||
|
Here's some more from the document. Their plan is to develop the site over a period of eight years (I'm guessing that just refers to utilities, surface infrastructure, and landscaping), and it'll have a maximum of 4,200 units. I want to be hopeful, but they say multiple times throughout the document that Times Square was already built in 2015-18 (at the same time as The Louvre and Century Tower), and it just worries me a little that they're off by a whole building.Century Park rezoning application going to EDC on November 18, 2025:
View attachment 694297
View attachment 694298