News   GLOBAL  |  Apr 02, 2020
 9.7K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.5K     0 

Hey, @Daveography, don't knock it -- these animated machines mow AND fertilize at the same time. I imagine that the Goat Coordinator's main task would be to ensure that the animal's mandibles don't clench onto some park-napping soul whose untucked shirt looks too appetizing to pass up.
 
Last week:

P2220025.jpg
P2220026.jpg
P2220027.jpg
P2220028.jpg
P2220029.jpg
 

Attachments

  • P2220026.jpg
    P2220026.jpg
    347.8 KB · Views: 632
  • P2220025.jpg
    P2220025.jpg
    340.4 KB · Views: 622
  • P2220028.jpg
    P2220028.jpg
    253.3 KB · Views: 640
  • P2220027.jpg
    P2220027.jpg
    356.9 KB · Views: 647
  • P2220029.jpg
    P2220029.jpg
    363.7 KB · Views: 620
Is that going to wrap around the Sutton too, since they are connected?
 
Facelift coming to this corner:

Capture.PNG
Rendering.jpg



ABOUT THE QUARTERS - 97 STREET
Prime pharmacy, medical clinic, child care, restaurant, or commercial opportunity. Situated across the street from Canada Place, and minutes away from Jasper Avenue, Shaw Conference Centre, and the upcoming Royal Alberta Museum.

LEGAL DESCRIPTION // Lots 25 & 26, Block 2, Plan ND
BUILDING / LOT SIZE // 3,900 sq. ft., single-storey commercial building on 602.392 m² lot.

We welcome the opportunity to work with potential tenants for their vision. Simply contact us to confirm availability and arrange a tour and you'll be well on your way to a new space.

https://spacelist.ca/p/ab/edmonton/9665_101a_ave_nw

DP submitted:

Reference ID: Job No 276361418-001
Description: To Construct Exterior Alterations (Facade Improvement)
Location: 9665 - 101A AVENUE NW
Plan ND Blk 2 Lots 25-26
Applicant: JAFFER DEVELOPMENTS INC, MARK SHUYA
Status: New
Create Date: 3/6/2018 11:28:18 AM
Neighbourhood: BOYLE STREET
 

Attachments

  • Capture.PNG
    Capture.PNG
    1,005 KB · Views: 830
  • Rendering.jpg
    Rendering.jpg
    74.3 KB · Views: 758
There are some weird ones like that. Noticed some AHS extension to a building out on 142 Street or 111th Ave? No idea what it was, but I think it had a crane.
 
@westcoastjos ATA (Alberta Teachers Association). Interesting that one given that it comes just a few years after they added some floors to the top of the existing 1960s(?) building. It's good to see them use, expand, and refit the existing structure.

I believe that used to be the ALCB once upon a time, before they built their facility in St. Albert in the 80s.
 
Campus Master Plan Open House
Tue, Mar 27 2018

Help us shape our Campus Master Plan.
MacEwan is developing a Campus Master Plan that will guide how the university will grow and develop over the next 25 years. And we want to hear from you.

This is an exciting moment in the university's history - a chance to take stock of our priorities, objectives, and aspirations, and determine how they will manifest themselves in the way our campus grows and evolves. When complete, the master plan will guide effective land use and the phased physical development and expansion of our campus.

We want to hear from you - join us at an Open House
Members of the community are invited to join us in an evening of discussion about the future of MacEwan University's campus and to offer input in helping to shape and define a clear direction for our Campus Master Plan. interactive graphic panels will be on display to providing information on the project purpose, process, and the outcomes of preliminary work already completed including interviews with stakeholders. Some preliminary design concepts will also be on display, along with information about the themes and key design priorities that were used to develop them.

Open House format
The Open House is an opportunity for you to mix and mingle around the panels, provide comments on the information on display, and have focused one-on-one conversations with the project team.

A presentation will be given at 6:30 p.m. which will touch on topics including:
  • the project's objectives and process
  • an overview of the first stage process and outcomes
  • what we've heard to date through the stakeholder interviews
  • a walk-though of the development concepts
  • a review of the emerging themes
  • a discussion of the key design priorities.
You'll also have the opportunity to ask questions after the presentation.

For more information, contact
Jacqueline McLeod, Director, Space Management, MacEwan University
E: McLeodJ11@macewan.ca

Gail Shillingford, Project Manager - DIALOG
E: GShillingford@dialogdesign.ca

Event Details
Date Tue, Mar 27 2018
Start Time 4 p.m.
End Time 8 p.m.

Location
Paul Byrne Hall
9-115 City Centre Campus
10700 - 104 Avenue
Edmonton, AB

Event Type Lecture/speaker/presentation

https://www.macewan.ca/wcm/MacEwanEvents/MASTER_PLAN_OPENHOUSE_1
 
@westcoastjos ATA (Alberta Teachers Association). Interesting that one given that it comes just a few years after they added some floors to the top of the existing 1960s(?) building. It's good to see them use, expand, and refit the existing structure.

I believe that used to be the ALCB once upon a time, before they built their facility in St. Albert in the 80s.

I thought the ALCB was only in the warehouse that is being renovated at 124ave and 142st. After ALCB moved out it was used as an education department ware house. The ATA building was ATA when I went to high school down the street in the late 70s.
 

Back
Top