YEG imagineer
Active Member
51 Ave east of the CPR tracks on the north side has a bunch of earth movers and equipment flattening out the site. This has been empty for seems forever. Could not see a sign describing what is getting built though.
East of Gateway BLVD and the tracks…..by the Eco Recycling Center? Between the tracks and PCL’s HQ? That lot?
| Status | Approved |
| Permit Date | Sep 29, 2025 |
| Neighbourhood | CORONET INDUSTRIAL |
| Address | 10110 - 51 AVENUE NW |
| Legal Description | Plan 0721428 Blk 13 Lot 31 |
| Description of Development | To construct exterior alterations for the purpose of site regrading for future Surface Parking lot and new building, reference development pre-application meeting #625355930-001. |
| Zoning | DC,BE |
51 Ave east of the CPR tracks on the north side has a bunch of earth movers and equipment flattening out the site. This has been empty for seems forever. Could not see a sign describing what is getting built though.
| Major Development Permit | ||||||||||||||||||||
|
Here's some more from the document. Their plan is to develop the site over a period of eight years (I'm guessing that just refers to utilities, surface infrastructure, and landscaping), and it'll have a maximum of 4,200 units. I want to be hopeful, but they say multiple times throughout the document that Times Square was already built in 2015-18 (at the same time as The Louvre and Century Tower), and it just worries me a little that they're off by a whole building.Century Park rezoning application going to EDC on November 18, 2025:
View attachment 694297
View attachment 694298
New development permit for the former CapitalCare Greenfield site (behind the NoFrills on 40 Ave).
View attachment 694869
View attachment 694868