vistaway
Active Member
The park is moving along quickly:
Tea House/Washroom Pavilion Construction:
East Lawn grading done:
Sidewalks, tree pits and slab benches on the eastern side are done or UC. The lawn is actually a pretty decent height - enough for small kids to sled on in the winter.
Tea House/Washroom Pavilion Construction:
![061620101330.jpg](http://i13.photobucket.com/albums/a278/vistaway1/MCC%20Photos/061620101330.jpg)
East Lawn grading done:
![061620101331.jpg](http://i13.photobucket.com/albums/a278/vistaway1/MCC%20Photos/061620101331.jpg)
Sidewalks, tree pits and slab benches on the eastern side are done or UC. The lawn is actually a pretty decent height - enough for small kids to sled on in the winter.