News   GLOBAL  |  Apr 02, 2020
 9.7K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.5K     0 

For the record, the new inauguration date for Museum station is April 8 according to the National Post.

This photo shows the spotlights on the edge of the photograph:
museummm.jpg
 
Did they install elevators to the platform at Museum station at the same time or will they be ripping things up again in a few years?
 
They roughed things in for this. Areas where they're going to do future work such as the second exit and elevators have simply been painted over.

I'm assuming that once the ROM gets its act together on the Planetarium site, we'll see work done on the mezzanine. The second exit is already on the TTC's plans although I'd like to know when its planned to happen.
 
This Globe article provides some interesting details on the construction and those involved. I must caution that the enthusiasm is infectious, even with the questionable design direction, the flaws and lack of new functionality.

Tomb raiders in the TTC
Soon to be unveiled, the retrofit at Museum station is driving commuters mad for a glimpse of what lies beneath the shrouds

JOHN LORINC
March 8, 2008

It's one of those projects that has been tough to keep under wraps, literally.

Subway riders have become increasingly nosy about what's going down in the Museum station, although they could be forgiven their curiosity.

Some have prised open cracks in the construction hoardings or tried to peel away the heavily taped black tarps sheathing the station's 46 columns. Late at night, a few regular riders quizzed the workmen about their progress. One recent evening, some enthusiastic tourists from New York City even snapped photos of one another posing next to the bulky pillars with their strange protuberances.

"People have been grabbing and taking the cloth apart, just so they can get a glimpse," mused Damiano Petrozza, a soft-spoken contractor who owns Jeviso Construction, the Vaughan firm whose crews have been toiling through the wee hours on a high-profile project designed to transform the eponymous station into something of a calling card for the newly refurbished cultural institution up above.

The refurb has cost $5-million, with the necessary funds already raised from the Toronto Transit Commission, the Ontario government and private donors. Toronto Community Foundation chief executive Rahul Bhardwaj says his group is exploring the possibility of makeovers for Osgoode and St. Patrick, thematically linking the stations with three nearby cultural institutions: the Four Seasons Centre for the Performing Arts, the Art Gallery of Ontario and the Ontario College of Art & Design. "That's the raison d'être of the whole initiative," Mr. Bhardwaj says.

The project, first bruited in the summer of 2005, was to be unveiled last Christmas, but the launch has been moved to April 8. While the TCF is keeping the ultimate product secret, Mr. Petrozza dropped by the station this week to describe a finicky, exhausting but highly rewarding task that is quite unlike anything his general contracting firm has ever taken on.

The bulk of the work was done each night between 7 p.m. and 5 a.m., but the crews rebuilding the wall panels had to wait until about 2:30 a.m., when the TTC stopped using the tracks and the power could be shut off.

"You go like hell for about two, 2½ hours," said site supervisor Tim Uptegrove, who virtually lived down in the station for the duration. "By 5 a.m., you have to be cleaning up."

The first job was to smash up all the old yellow tiles and haul out the debris by hand, up two flights of stairs to a dumpster waiting on University Avenue.

Mr. Petrozza's crew then spent four gruelling months drilling 10,000 holes in the concrete walls, in which they inserted epoxy glue and foot-long "fasteners." These bolts must support the 420 new clay-coloured panels, including those with the giant floating orange letters spelling the word "Museum" that are adorned by hieroglyphics.

Meanwhile, on the platform, the contractors walled off the columns, eight at a time, and then stripped them back to the 50-year-old steel beams that keep the ceiling up. "They are extremely well built," Mr. Petrozza observed. "That's one thing I have to say about the TTC: When they did something, they did it well."

After the exposed girders were coated in fire-resistant foam, it was time for the main event: The installation of the handmade mouldings meant to evoke artifacts from the Royal Ontario Museum's extensive antiquities collections.

"The process was a lot less high-tech than you might imagine," said intern Jessica Waese, at Diamond + Schmitt Architects, the firm responsible for the redesign. Four artisans from Oakville's Design Plaster Moulding began by carving sculptures into pillars of rigid foam, using images and input from ROM curators.

These were refined several times to produce the final moulds, which were used to create the actual castings out of a shock- and graffiti-resistant substance called "glass fibre cement compound."

Ms. Waese, who oversaw the painstaking task, was told by TTC engineers that the compound had to be absolutely abuse-proof and would be tested by TTC personnel wielding hockey sticks and mallets before being approved for use on the platform.

Each column is made of two 110-kilogram castings that have been proportioned to fit snugly around the coated girders. Mr. Petrozza says the 92 column halves, each 2.4 metres long, had to be gingerly carried down to the platform by teams of six men.

Skilled tile-layers prepared the base of each column by fashioning square, tapered pedestals from terrazzo, a floor covering made from crushed marble and cement. The crews then hoisted the castings onto the pedestals, positioned them carefully and glued the halves together using fast-setting epoxy applied to plates on the insides of each. The workers had less than half an hour to get the pieces in place. "They had to be really accurate about what they were doing," he said. "It's a glue that will stay there forever." Every one of the station's 46 columns took about two days to complete.

With only a few electrical odds-and-ends left to finish before the launch, Mr. Petrazzo is clearly proud, and seems keen to take on another station, should the opportunity arise. "Not just for the prestige," he added, "but for the work itself. You're not only doing it for yourself. You're doing it to beautify a part of Toronto."

The motivating force

The Toronto Community Foundation, which put in $1-million to the Museum station project and helped find further donors, is a registered charity that was established in 1981. The foundation's mission is to connect philanthropy to community needs and opportunities.

The foundation has an endowment upwards of $195-million to sustain charitable organizations in Toronto and the surrounding area.

The foundation's chief executive officer is Rahul Bhardwaj. A former Bay Street lawyer, he was vice-president of Toronto's 2008 Olympic bid.

The foundation's chair is Martin Connell, co-owner of Ace Bakery.
 
So this article does seem to imply that there won't be any more major work (ceilings).

That's a shame. The ceilings really needed to be refitted. I haven't seen them lately, but the ceilings looked worse than before the reno when they at least had the drop down ceiling fixtures.
 
Ms. Waese, who oversaw the painstaking task, was told by TTC engineers that the compound had to be absolutely abuse-proof and would be tested by TTC personnel wielding hockey sticks and mallets before being approved for use on the platform.

Oh how very Canadian of them! :rolleyes:
 
The first job was to smash up all the old yellow tiles and haul out the debris by hand, up two flights of stairs to a dumpster waiting on University Avenue.

I suspect the first job was to remove the tiles, not smash them.

These were refined several times to produce the final moulds, which were used to create the actual castings out of a shock- and graffiti-resistant substance called "glass fibre cement compound."

Ms. Waese, who oversaw the painstaking task, was told by TTC engineers that the compound had to be absolutely abuse-proof and would be tested by TTC personnel wielding hockey sticks and mallets before being approved for use on the platform.

Each column is made of two 110-kilogram castings that have been proportioned to fit snugly around the coated girders. Mr. Petrozza says the 92 column halves, each 2.4 metres long, had to be gingerly carried down to the platform by teams of six men.

Guess they didn't pass the hockey stick test? Or does the writer mean to imply that carrying something, as opposed to kicking it forcefully down the stairs, constitutes 'gingerly' ?

J.Lo is normally a good writer :(
 
I used to think Dundas had the ugliest station colour imaginable, but Museum has managed to lower the limbo bar another notch. I also do like the orange letters with hieroglyphics, though.

JOHN LORINC
March 8, 2008

The first job was to smash up all the old yellow tiles and haul out the debris by hand, up two flights of stairs to a dumpster waiting on University Avenue.

Two flights of stairs? And hauling shards of tile by hand?? Aww, poor babies.

*Egyptian pyramid-building slaves howl with laughter from the afterlife*
 
So it looks like they're not doing anything to the ceiling after all. Typical half assed job. :S
 
I was going to post photo's some time ago, but Flickr wouldn't post them for some reason. They are linking them now.

I guess the money ran out for doing the ceiling.

If this is an example of what to come for other stations, forget. This is a haft ass project and not close to the rendering drawing.

When I saw the new spot lights back on March the 3rd, I said it had to be TTC doing the electrical work and game over.

If the unveiling is to take place in 2 weeks, a short time to get the ceiling up if it is to happen.

I notices the new lights for the DWA were off.

Have to take a look Sat if ALL the ceiling area has been painted as it wasn't the last time I saw it.

Will they have the large adds in place for the unveiling that are missing at this time?

This station is now add station.

By the way, get your last photo shots of St Andrew and St George as changes are coming within the next month or so as the wall slats are being change along with the ceiling and a few other things.

Photo's from March 3rd.
2351303368_8abb306a85_b.jpg


2350469853_35d9f5d8ea_b.jpg


2350469079_e04a18f624_b.jpg


2350468267_3d0005c4d4_b.jpg


2351300282_8ba1d5c7ea_b.jpg
 
They're going to have to do something about that ceiling which currently looks utilitarian, or they'll get a lot of bad press about these projects. Worse than bringing the museum into the station is bringing the museum's warehouse into the station.
 
A few questions:


1) The hanging security camera is surely an indicator that roofing will be installed isn't it?

2) Where are the signs along the top of the platform which became the new standard when Downsview station and the Sheppard Line were built?


3) What is going on with the bare walls painted to match the panels? It looks like they ran out of panels and cheaped out.

4) How did they decide the positioning of the mini Museum signs on the wall? Looks like the small sign is right next to the big one and then there is no sign for quite a distance.
 

Back
Top