Formerly known as 'Trillium Line'

Project Website

Current status (Feb 2024) :
Line 2 Bayview-Limebank U/C
Line 4 South Keys-Airport U/C


Previous discussions on SSP Ottawa:


Trillium Line Upgrades & Extension (Stage 2) [Greenboro to Airport/Limebank] | U/C
Trillium Line (O-Train) Updates
map.jpg
 
Article from CTV today:

Opening date for Trillium Line still uncertain with final tests underway A train sits at Bayview Station as construction continues on the north-south Trillium Line. (Leah Larocque/CTV News Ottawa)

Opening date for Trillium Line still uncertain with final tests underway​


A train sits at Bayview Station as construction continues on the north-south Trillium Line. (Leah Larocque/CTV News Ottawa)

A train sits at Bayview Station as construction continues on the north-south Trillium Line. (Leah Larocque/CTV News Ottawa)

william-eltherington--ctv-news-ottawa-1-6716310.jpg


William Eltherington

CTV News Ottawa Digital Multi-Skilled Journalist

Contact

Published Feb. 21, 2024 3:13 p.m. EST



OC Transpo officials are still not committing to an opening date for the Stage 2 Trillium Line, but are hinting that "very good news" might be on the way next week.
"We'll have very good news to share, stay tuned," said transit services general manager Renée Amilcar at a media availability on Wednesday.
"I've always said that for the Trillium Line, it should be this spring, so I'm still there," Amilcar said.

A report shared with councillors(opens in a new tab) for next Thursday's Light-Rail subcommittee meeting said final construction of Line 2 "is well underway," including the near completion of the stations and signalling systems.
The report says the city will "review and assess an opening date along with the required regulatory approvals," with the final date selected being "heavily influenced by the safety, reliability, and general performance of the system."
Some of the remaining risk factors that could further delay the opening date include safety and security management, system wide testing and performance, training completion by operators, regulatory requirements, construction completion and third-party development.
Starting in January, test trains have been operating on the mainline and airport extension between 7 a.m. and 11 p.m. Monday to Friday. The report says OC Transpo plans to increase the number of operating hours of the trains to match planned service levels.
"This period of additional running time, including through the current winter season, is critical to surfacing and correcting issues before the line opens for service," the report says.
Last November, OC Transpo began testing seven trains on the mainline Trillium Line and two on the airport extension. Additional testing is currently underway to "demonstrate the functionality of the system and to ensure the operations of the train control systems."
Final preparations for the train stations are also underway, including elevator adjustments and inspections, installation of aluminum panels, final glazing installation and communications device commissioning.
The report adds that 9 of the 54 diesel rail operators have completed their certifications, while 24 are progressing through their classroom training program. Twenty-three have completed their classroom training and are expected to receive their final certification in Q1 and Q2 of 2024.
Construction for the Trillium Line was originally scheduled to be completed in August 2022, but was delayed until September 2023. On Sept. 29, Amilcar said that based on the progress to date, a fall launch was no longer possible and would be delayed until the "spring of 2024."
Regulatory approvals from Transport Canada and the Canadian Transportation Agency, Building Code Services and Ottawa Fire Services, and secondary approvals for elevators from the TSSA are still ongoing.
 
Strange since they extended an existing line and added 2 stations, testing should be relatively easy and quick. If they started testing in November, that means it's been almost 4 months of testing... I guess they are being overly cautious after what happened with the opening of line 1. I'm hopeful though since the article says "very good news" might be on the way next week.
 
Yet they were so confident in the million completion dates they had announced previously.
 
SHOCKING news that nobody expected from CTV:

Trillium Line hits another delay, opening pushed back through the summer


A train sits at Bayview Station as construction continues on the north-south Trillium Line. (Leah Larocque/CTV News Ottawa)
A train sits at Bayview Station as construction continues on the north-south Trillium Line. (Leah Larocque/CTV News Ottawa)

william-eltherington--ctv-news-ottawa-1-6716310.jpg


William Eltherington

CTV News Ottawa Digital Multi-Skilled Journalist

Contact

Published Feb. 27, 2024 4:41 p.m. EST


OC Transpo officials say the north-south Trillium Line could hit yet another delay, with the timeline for opening being extended into the summer.

Councillors have been told in a slide presentation on Stage 2 construction on late Tuesday afternoon that OC Transpo is giving themselves a wider timeline than had been previously announced with an opening day potentially being in September.

A slide says the transit authority's period for handover could be between April and June, with passenger service happening sometime between May and September, but a firm date had not been given. Officials had previously said the window for handover would be between February and April and passenger service would be between March and June.

Transit services general manager Renée Amilcar had said the anticipated opening date would be in "spring of 2024" in recent months.

Construction for the Trillium Line was originally scheduled to be completed in August 2022, but was delayed until September 2023. On Sept. 29, Amilcar said that based on the progress to date, a fall launch was no longer possible and would be delayed again.
This could mean the Trillium Line would open a full two years behind schedule. This would be the third major delay.

At a media availability after last week's city council meeting, Amilcar said she was still anticipating the opening date to be sometime in the spring and added she would have "very good news" to share at Thursday's Light-Rail subcommittee meeting.
"I've always said that for the Trillium Line, it should be this spring, so I'm still there," Amilcar said last week.

The Trillium Line will run between Bayview Station and Riverside South, with a spur to the Ottawa Airport.
 
Am I missing something? Because the headline states pretty boldly that opening would be in summer, yet there doesn't seem to be any reliable source confirming this outright in the article. Amilcar has said last Spring 2024 and that good news were on the way this week so I'm confused...
 