Long time viewer, first time poster. I work in Simcoe Place and we get monthly RBC Centre construction updates. For the month of January, "the construction activities that will take place around the development of
the RBC Centre are as follows:
o The glass enclosure for the Lantern feature at the top of the building will start.
o Installation of access flooring in the typical office floor areas will start and proceed up the
building on levels 17, 18, 19 and 20 in the tower area.
o All construction work on levels 4, 5, 6, 8 and 9 both the Tower and the Podium will be
complete.
o Installation of access flooring in the podium will be complete.
o Finishes in all podium floors will be completed.
o Ground floor lobby stone flooring and ceiling work will continue.
o RBC signs at the top of the building will be placed.
o Derricks will be assembled on the roof for dismantling of the cranes.
o Both tower cranes #1 and # 2 will be dismantled, lowered to the ground and removed from
the site. "