drum118
Superstar
Why?? The taggers will their thing and that nice paint job is lostI hope they at least give the storage facility a paint job!
|
|
|
Why?? The taggers will their thing and that nice paint job is lostI hope they at least give the storage facility a paint job!
FairWhy?? The taggers will their thing and that nice paint job is lost
Why can't the Gardiner be re-routed over the Metrolinx Don Yard?
Or is the hybrid option already set in stone with contracts signed already?
well I think Lakeshore east of the Don River is actively being reconstructed without any provisions made for reinstating the Logan on/off ramps, so to add them back would mean ripping up Lakeshore soon after current reconstruction, which I guess Ford could do, but would seem like a waste of moneyI haven't kept up with everything on the Gardiner. But with the Gardiner being uploaded, can Doug Ford still change plans from hybrid option to the other options previous debated on. Or is the hybrid option already set in stone with contracts signed already?
If I remember correctly, he wanted to rebuild the Gardiner as is, with the Logan off ramps, and he wasn't in favor of hybrid when he was on council?
I doubt he'll make this an issue again. But I wouldn't put it pass him.
I'm not sure that would the most expensive cost. I think there is still place for new pillars.well I think Lakeshore east of the Son River is actively being reconstructed without any provisions made for reinstating the Logan on/off ramps, so to add them back would mean ripping up Lakeshore soon after current reconstruction, which I guess Ford could do, but would seem like a waste of money
Well they would also need to redo the plans for the intersection of the new Broadview extension and Lakeshore, as that would be where the old ramps were, there would need to be clearance for a street car to pass under the ramps as well.I'm not sure that would the most expensive cost. I think there is still place for new pillars.
The big cost would be the impacts to the contracts to build the current design. But as that work doesn't start until 2027, there's still time to change that.
Well, they could move the ramps to Leslie instead.Well they would also need to redo the plans for the intersection of the new Broadview extension and Lakeshore, as that would be where the old ramps were, there would need to be clearance for a street car to pass under the ramps as well.